Join Club

Yorktown High Construction To Conclude This Summer

Yorktown High School classroom trailersThe final phase of construction on the new Yorktown High School is on track to be completed by the end of this summer.

The construction began in 2009 and has been split into three phases, with Phase 1 completed in the summer of 2010 and Phase 2 in December 2011. Phase 3 is now in its finals stages.

Meanwhile, the classroom trailers that had housed overflow students during construction have been moved into the parking lot for Phase 3 while the tennis courts are being replaced. Arlington Public School officials sent a letter last month to parents assuring them that the trailers will be removed soon and will not be there when school starts in September.

The work on Phase 3 includes the demolition of the school’s Greenbrier Wing — facing Greenbrier Park and 28th Street N. — as well as its original gymnasium and swimming pool. In its place will be an auxiliary gym, new media center, permanent locker rooms (Phase 2 included temporary ones), classrooms and an interior courtyard.

Yorktown High School construction sitePhase 1 included the cafeteria, administration offices, classrooms and the renovated auditorium. Phase 2 consisted of the set shop, dressing rooms and green room for the auditorium, music rooms, the black box theater, the main gymnasium, weight room, wrestling room and the aquatics center. Both phases also integrated the school’s 58,000-square-foot 2004 renovation and a portion of the original auditorium.

The old school was built in the 1940s and originally opened in 1950 as an elementary school. It was converted to a high school for the 1960-1961 school year to alleviate overcrowding at the county’s first secondary school, Washington-Lee High School.

Wakefield High School has also undergone the construction of a new school building, which is scheduled to be finished August 2013. Both new buildings are expected to receive LEED Silver certification from the U.S. Green Building Council.

Recent Stories

Good Friday evening, Arlington. Let’s take a look back at today’s stories and a look forward to tomorrow’s event calendar. 🕗 News recap The following articles were published earlier today…

An explosives detection K-9 celebrated his retirement at Reagan National Airport today. Messi, an 8-year-old yellow lab, was feted this morning in the historic Terminal 1 lobby with a surprise…

Walk to Lee Heights shops from 1930s Tudor on beautiful terraced lot

Arlington’s response team for people in mental health and substance use crises is on track for a substantial buildout. An additional $478,286 in federal funds would allow Arlington to hire…

The Award is available to recent high school graduates and non-traditional students (see the application for more details). Each recipient may be awarded up to $20,000. Applicants are required to submit an online application form as well as a short video application.

The applicant must be an Arlington resident pursuing a career or technical education accredited program, within a high-growth career, that will be completed within two years.

The careers and programs include, but are not limited to:

  • Audio, Video, and Sound Engineering Technicians

  • Broadcast Technicians

  • Commercial Drivers

  • Culinary Arts

  • Early Childcare Education

  • Healthcare

  • Information Technology and Computer Science

  • Manufacturing and Skilled Trades (including welding, auto and aviation mechanics and technicians)

  • Public Safety

Read More

Submit your own Announcement here.

ACFCU’s Free Homebuying 101 Webinar: Steps to Getting Pre-Approved

Are you ready to jump into homeownership, or have you started considering it but don’t know where to start?

Financial preparation is key when thinking about purchasing your first home and the first step to getting pre-approved. Join ACFCU for

Sweeney Todd

A victim of a gross injustice that robbed him of his wife and child, Sweeney Todd sets about exacting a terrible revenge on society.

×

Subscribe to our mailing list