Long Bridge Drive Reconstruction Costs Increase — Again
  • fedworker July 15, 2013 - 12:06 pm #80082 Reply

    http://arlington-va.patch.com/groups/politics-and-elections/p/long-bridge-drive-reconstruction-costs-increase–again

    This article got me thinking about what the ColPike streetcar project…estimated cost $240M.  If I recall correctly from the townhall meeting, the cost estimate didn’t take risks, such as delays due to utility companies/infrastructure, into account and that the eventual cost could skyrocket to anywhere between $250M-$400M or even more!  But Tejada shrugged it off as those risks being quite incidental.

     

    halj July 15, 2013 - 12:38 pm #80086 Reply

    Fret not, soon enough Walter Tejada will have to answer to Q of the Continuum.

    Rick July 15, 2013 - 9:27 pm #80194 Reply

    The scary part is that $7.5 million of the original contract was for road work. And they’ve since tacked 1.6 million on to that. The way Arlington builds and maintains roads, 7.5 million is a lot of money.

    Swag July 16, 2013 - 10:22 am #80208 Reply

    It’s not a road, it’s 0.5 mile “multi-modal transportation corridor.”