Join Club

Preliminary Renderings of New H-B Woodlawn Building Released

The new Wilson School, future home of the H-B Woodlawn and Stratford programs, will be a multi-story building with fanning terraces and more shared spaces.

The idea behind the new building was to use space as effectively as possible, and the project team and architects behind the new school kept the needs of both programs in mind with the new design, said Sean Franklin, a designer with BIG, one of the architecture firms behind the project.

“What we really wanted to do was foster an environment of sharing between these programs,” Franklin said during a Aug. 13 School Board meeting, where the new design plans were unveiled.

The new Wilson School will have a main entrance on Wilson Blvd, with a separate entrance on 18th Street for Stratford program students to allow them to more easily access the building. The Stratford Program will have the majority of the space of the lowest level, while H-B Woodlawn will have classrooms on the first through fifth floors. There will be shared spaces throughout the building.

Stratford Program Principal Karen Gerry said that she is working with H-B Woodlawn Principal Casey Robinson to identify spaces in the Wilson School that they could share, including a new multipurpose room, a black box theatre, cafeteria and library.

“Casey and I believe this will allow for more collaboration between H-B and Stratford staff and H-B and Stratford students, and that’s a win-win for all of us,” she said.

The new school will also feature fanning terraces, which will allow for open spaces for both recreation and learning. The terraces will each be designed differently, depending on the classrooms on the same level, Franklin said.

“The idea is that they’ll each have their own identity tied to something that’s inside the classroom. So if the classroom has a theme, it’ll carry on to the terraces,” he said.

Connecting the terraces is a central staircase that will be wide enough to also use as a learning space and to supervise students in the tall building, she said.

“Day lighting” was also an important part of the new designs, Gerry said. The new classrooms, which will be larger than existing classrooms, will be designed to allow in more daylight, which “decreases sensory input to heighten
instructional output.”

The total cost for the new school will be about $100 million, about $20 million more than the original cost, according to the design plans. Additional costs came from parking needs, elevation factors and market prices.

The current design calls for 92 underground parking space, at a cost of $5.7 million.

Arlington Public Schools will be examining ways to reduce costs without compromising learning in the next steps of the design process, according to the plans.

Recent Stories

Good Friday evening, Arlington. Let’s take a look back at today’s stories and a look forward to tomorrow’s event calendar. 🕗 News recap The following articles were published earlier today…

An explosives detection K-9 celebrated his retirement at Reagan National Airport today. Messi, an 8-year-old yellow lab, was feted this morning in the historic Terminal 1 lobby with a surprise…

Walk to Lee Heights shops from 1930s Tudor on beautiful terraced lot

Arlington’s response team for people in mental health and substance use crises is on track for a substantial buildout. An additional $478,286 in federal funds would allow Arlington to hire…

The Award is available to recent high school graduates and non-traditional students (see the application for more details). Each recipient may be awarded up to $20,000. Applicants are required to submit an online application form as well as a short video application.

The applicant must be an Arlington resident pursuing a career or technical education accredited program, within a high-growth career, that will be completed within two years.

The careers and programs include, but are not limited to:

  • Audio, Video, and Sound Engineering Technicians

  • Broadcast Technicians

  • Commercial Drivers

  • Culinary Arts

  • Early Childcare Education

  • Healthcare

  • Information Technology and Computer Science

  • Manufacturing and Skilled Trades (including welding, auto and aviation mechanics and technicians)

  • Public Safety

Read More

Submit your own Announcement here.

Unlike our competitors, Well-Paid Maids doesn’t clean your home with harsh chemicals. Instead, we handpick cleaning products rated “safest” by the Environmental Working Group, the leading rating organization regarding product safety.

The reason is threefold.

First, using safe cleaning products ensures toxic chemicals won’t leak into waterways or harm wildlife if disposed of improperly.

Second, it’s better for you and your family. Fragrant chemicals in surface cleaners can expose you to a similar amount of pollutant particles as a busy city road, New Scientist reported.

Read More

Submit your own Announcement here.

ACFCU’s Free Homebuying 101 Webinar: Steps to Getting Pre-Approved

Are you ready to jump into homeownership, or have you started considering it but don’t know where to start?

Financial preparation is key when thinking about purchasing your first home and the first step to getting pre-approved. Join ACFCU for

Sweeney Todd

A victim of a gross injustice that robbed him of his wife and child, Sweeney Todd sets about exacting a terrible revenge on society.

×

Subscribe to our mailing list