Press Club

Interchanges Along Route 50 Now Complete

All of the ramps, lanes and bridges for the interchanges of Route 50, N. Courthouse Road and 10th Street N. are open and finished.

Arlington County Board Chair Jay Fisette, Del. Patrick Hope and local and state transportation officials were on hand to cut the ribbon on the $39 million project that has been more than a decade in the making.

“My first County Board meeting in January 1998, in the first Board packet, the design of this interchange was in that packet,” Fisette said. “Really good things take time and partnerships. Hopefully we will continue to get these types of outcomes.”

The new interchange includes two new bridges at Courthouse Road and 10th Street, each with LED-lit metal grillwork displays, although the LED lights aren’t ready to be turned on yet. It includes a left-exit from eastbound Route 50 onto N. Courthouse Road, and turning lanes from westbound Route 50 that are separated from the three lanes of fast-moving traffic.

“Everyone who drives on Arlington Blvd every single day is going to have a much better experience,” Hope said.

In addition to the new traffic patterns and LED lights, the sides of the new highway have custom-designed concrete panels. The grillwork and panels were both designed by artist Vicki Scuri. The LED lights and landscaping along the highway are the only two components of the project that are not yet finished.

The project also included new bicycle and pedestrian paths along either side of the highway, with striping for two-way travel, between N. Pershing Drive and Courthouse Road on the westbound side, and Pershing and N. Rolfe Street on the eastbound side.

“This project represents the values we hold in Arlington. it’s about safety, it’s about travel choices,” Arlington Director of Transportation Dennis Leach said. “What an incredible difference this is if you are walking or biking.”

Recent Stories

A driver in an SUV struck a juvenile riding a bike along Langston Blvd this afternoon. The crash happened around 4:20 p.m., in or near the crosswalk at the intersection…

Today’s Listing of the Day is a 4 BD/4 BA home with an open kitchen and wood burning fireplace.

The weekend has arrived and, apparently, so have mid-summer temperatures. Perhaps a little too early. Forecasters warn residents not to let the heat take them by surprise as temperatures could reach…

The $15 million newly renovated Jennie Dean Park is reopening to the public this weekend, complete with a motorcycle parade, live music, and a celebration of local baseball history. The…

×

Subscribe to our mailing list