News

County Board to consider $1.1 million water main project near Rosslyn

Map showing site of water main project (via Arlington County)

The Arlington County Board is set to approve a contract for a new water main.

The new main will serve the Fort Myer Heights neighborhood, near Rosslyn, and will run under the N. Rhodes Street bridge over Route 50.

“This contract is for the construction of a 12-inch watermain between 14th Street North and North Queen Street,” notes a county staff report. “This contract includes approximately 230 feet of 12-inch ductile iron pipe suspended under the North Rhodes Street / Arlington Boulevard overpass Bridge. The proposed water main will provide system redundancy and improved pressure in the neighborhood.”

At its meeting tomorrow (Saturday), the Board will consider a $1.14 million contract, plus an approximate $230,000 contingency, with Alexandria-based contractor Sagres Construction Corporation.

The new main will replace a smaller pipe that broke and has not been returned to service.

“The Fort Myer Heights Watermain Improvement project is part of the effort to interconnect water supply systems to ensure redundancy,” says the county staff report. “The old 6″ watermain under Route 50 that connected the two sides of the Fort Myer Height’s neighborhood was isolated and abandoned in place after a water main break. The proposed 12″ watermain will interconnect the two sides of the neighborhood and thereby provide the essential redundancy and improved water pressure.”

Residents in the area can expect some temporary traffic and water disruptions during the project. A construction timeline was not given.