News

Arlington County is updating the section on bicycling in its Master Transportation Plan, and is asking residents to help shape how it should now look.

The Bicycle Element of the plan last received an update in 2008, and now staff from the county’s Department of Environmental Services said the time is right for a revamp given the new “technologies, facilities and best practices” around bicycling. Staff said they will get feedback from a wide range of people, including those in civic associations and business organizations.


News

Drivers in Westover and East Falls Church can expect traffic delays and detours in the coming weeks as the state and county repave and add bike lanes to Washington Blvd.

The project by the Virginia Department of Transportation, which owns and operates the street, is set to begin in the next couple of weeks with repaving between Lee Highway and N. McKinley Road.


News

Residents can have their food waste composted by the county as part of a pilot program launched earlier this month.

From 7:30 a.m. to 3 p.m. each weekday, any county resident can take their food scraps to the Department of Environmental Services’ Solid Waste Bureau at 4300 29th Street S. in Shirlington, near the Animal Welfare League of Arlington’s headquarters.


News

Arlington County has completed a series of modifications to Wilson Blvd between N. Patrick Henry Drive and Glebe Road, with the goal of improving pedestrian safety along the corridor.

The changes over the past year include “re-striping, sign installation, concrete work for curb ramps, bollards installation… marking additional crosswalks with marked median/islands, and other short-term improvements.”


News

Requests to add new residential permit parking zones or change current zones will be on hold for around two years so county staff can study the program’s effectiveness.

The moratorium, approved 3-2 by a divided Arlington County Board, freezes 16 active petition requests and prevents residents from filing more until after staff’s review.


News

A method of repairing water pipes, utilized by Arlington County, could be exposing residents and workers to health risks, according to new research.

A report out of Purdue University in Indiana found that the procedure, called cured-in-place pipe repair (CIPP), can emit harmful chemicals into the air, which sometimes are visible as plumes of smoke. Those nearby could then be exposed.


News

Some residents in Columbia Forest will be without water tonight (July 20) and traffic will be diverted for emergency repairs along Columbia Pike.

Crews from the county’s Department of Environmental Services will be making emergency water main repairs at the intersection of Columbia Pike and S. Frederick Street, beginning at 8 p.m. The repairs are scheduled to last until 8 a.m. July 21.


News

A 22-story apartment building has the go-ahead to start construction in Crystal City after the Arlington County Board unanimously approved the project at its Saturday meeting.

The building, with the address of 2351 Jefferson Davis Highway but located at the intersection of Crystal Drive and 23rd Street S., is set for 302 apartments on top of a podium of the existing two-story retail space. The building is part of the larger Century Center office and retail complex.


Traffic

County officials say the reduction of a westbound turn lane on Arlington Mill Drive near Shirlington is a pilot program and the backups it’s causing will be resolved by traffic signal adjustments.

Arlington Mill Drive was recently re-striped at the “T” intersection with S. Walter Reed Drive. One of the two left turn lanes from Arlington Mill to Walter Reed was removed and blocked off with bollards, a move intended to improve safety for pedestrians and bicyclists.


News

Arlington County Board members wrestled last night with a plan to substitute car parking spaces for spots for bike and car-sharing at new apartment and condo buildings near Metro stations.

The proposal, put together by county staff as part of a number of changes to parking policy under discussion at a Tuesday work session, is meant to encourage developers to contribute to other transit options.


News

(Updated 12.55 p.m.) Residents in North Rosslyn have been without water since yesterday (Monday) afternoon after a water main break on N. Scott Street.

Crews from Arlington’s Department of Environmental Services have been making emergency repairs since last night at 1815 N. Scott Street.


View More Stories