News

Crystal City-Airport Pedestrian Connection Feasible, Study Finds

A Crystal City to Reagan National Airport pedestrian connection is feasible, according to a study conducted by the Crystal City Business Improvement District.

The study, released today (Thursday), determined that the connection would allow most Crystal City residents and employees to walk to the airport within approximately 15 minutes. The connection would link the airport’s terminal B/C parking garage with a JBG Smith private office building complex on Crystal Drive near 20th Street S.

Construction is estimated to cost approximately $38 million, with annual maintenance fees of $100,000. Various possible pedestrian connection configurations, including both open air and enclosed setups, were illustrated in the study. One configuration envisions the pedestrian bridge as a park-like destination, akin to New York City’s High Line.

The majority of airport arrivals are via either private car or taxi. Only 12 percent of arrivals are via Metro, according to the study.