Press Club

New Bike Lanes and Sidewalks Planned for Western Arlington

Three safety and beautification projects are coming to western Arlington streets.

This Saturday the County Board is scheduled to vote on $2.8 million in construction contracts for Neighborhood Conservation projects. The three projects are all at the western edge of Arlington, near Falls Church.

The project at Patrick Henry Drive near Westover Apartments will add dedicated bike lanes from Washington Boulevard to 16th Street N.

The other two projects — 2nd Street South at S. Kensington Street and N. Quintana Street — will add new sidewalks. The N. Quintana Street project will also add streetlights.

The projects are all planned to:

  • Improve pedestrian connectivity
  • Provide disability accessible routes
  • Rehabilitate existing roadways
  • Improve drainage

The projects are 32 percent more expensive ($883,379) than when they were first proposed in 2017, which staff attributed to inflation in construction costs and higher construction standards enacted by the county since then.

Photo via Google Maps

Recent Stories

Update at 7:25 p.m. — A Flood Warning has been issued as well. 718 PM EDT Sun May 22 2022 …FLOOD WARNING IN EFFECT UNTIL 115 AM EDT MONDAY… *…

A driver in an SUV struck a juvenile riding a bike along Langston Blvd this afternoon. The crash happened around 4:20 p.m., in or near the crosswalk at the intersection…

Today’s Listing of the Day is a 4 BD/4 BA home with an open kitchen and wood burning fireplace.

The weekend has arrived and, apparently, so have mid-summer temperatures. Perhaps a little too early. Forecasters warn residents not to let the heat take them by surprise as temperatures could reach…

×

Subscribe to our mailing list