Join Club

County to Repave Quincy Street And Add Bike Lane, Removing Parking

A portion of N. Quincy Street is slated for a makeover this summer with new pavement and a bike lane.

Officials aim to repave the stretch of N. Quincy Street between the I-66 overpass and Fairfax Drive, near Washington-Liberty High School, and potentially approve one of three designs for a new bike lane that could eliminate parking spaces.

Arlington’s Department of Environmental Services polled residents about the three bike lane designs in a recent survey. The department will host an open house about the project on Tuesday, July 9, from 6-7:30 p.m., at Washington-Liberty (1301 N. Stafford Street).

The three bike lane configurations the department is considering are:

  • Concept A: A buffered bike lane along both sides of N. Quincy Street in the northern section close to I-66. Adding the lane would eliminate 22 parking spaces along Quincy near the Buck site entrance where several single family homes sit.
  • Concept B: A buffered bike lane that runs in the middle of N. Quincy Street, which removes only 10 parking spaces in the northern section close to I-66.
  • Concept C: A buffered bike lane along the entire street, which would remove 42 parking spaces on the northern section of the street and 31 spaces on the south section.

“It’s almost like a mix and match,” DES Project Planner Christine Sherman told ARLnow. “Concept A shows parking on a block [of N. Quincy Street], concept B shows parking on a different block. Concept C shows the highest level of bike protection.”

All three concepts also add a crosswalk at the intersection of Quincy and 11th Street N. and at the entrance of the Buck property.

Sherman said DES will weigh the survey responses against engineering recommendations about safety and hopes to start the paving work later this summer.

DES tweeted about the (now closed) project survey last week, along with a reference to presidential candidate and meme-machine Marianne Williamson.

The  recently-updated bike element portion of the county’s master transportation plan proposes N. Quincy Street become part of a north-south bike corridor.

The bike element proposes several miles of bike lanes “wherever feasible” on N. Quincy Street to provide safer passage through Ballston and Virginia Square, and to connect the Arlington Forest and Chain Bridge areas.

“We have buffered and expanded bike lanes to the north of this segment and have protected bike lanes to the south,” said Sherman. “It’s an opportunity we see to create the north-south connection in the county.”

The work is also part of a larger streetscape project along Quincy Street, with repaving already completed in the sections between the I-66 overpass and Lee Highway, and between George Mason Drive and Fairfax Drive.

In August, the county finished a new bike lane on N. Quincy Street connecting the Quincy corridor to the Custis Trail. Two months before that, the county also converted parking on 5th Road N. between Quincy and N. Pollard Street to back-in, angle style parking.

Image 1, 3-5 via Arlington County, image 2 via Google Maps

Recent Stories

Good Friday evening, Arlington. Let’s take a look back at today’s stories and a look forward to tomorrow’s event calendar. 🕗 News recap The following articles were published earlier today…

An explosives detection K-9 celebrated his retirement at Reagan National Airport today. Messi, an 8-year-old yellow lab, was feted this morning in the historic Terminal 1 lobby with a surprise…

Walk to Lee Heights shops from 1930s Tudor on beautiful terraced lot

Arlington’s response team for people in mental health and substance use crises is on track for a substantial buildout. An additional $478,286 in federal funds would allow Arlington to hire…

The Award is available to recent high school graduates and non-traditional students (see the application for more details). Each recipient may be awarded up to $20,000. Applicants are required to submit an online application form as well as a short video application.

The applicant must be an Arlington resident pursuing a career or technical education accredited program, within a high-growth career, that will be completed within two years.

The careers and programs include, but are not limited to:

  • Audio, Video, and Sound Engineering Technicians

  • Broadcast Technicians

  • Commercial Drivers

  • Culinary Arts

  • Early Childcare Education

  • Healthcare

  • Information Technology and Computer Science

  • Manufacturing and Skilled Trades (including welding, auto and aviation mechanics and technicians)

  • Public Safety

Read More

Submit your own Announcement here.

ACFCU’s Free Homebuying 101 Webinar: Steps to Getting Pre-Approved

Are you ready to jump into homeownership, or have you started considering it but don’t know where to start?

Financial preparation is key when thinking about purchasing your first home and the first step to getting pre-approved. Join ACFCU for

Sweeney Todd

A victim of a gross injustice that robbed him of his wife and child, Sweeney Todd sets about exacting a terrible revenge on society.

×

Subscribe to our mailing list