Events

With earlier sunsets ahead, two Arlington County organizations are distributing free bike lights, reflective vests and other safety gear this week.

Representatives from BikeArlington and WalkArlington be handing out gear from 4-6 p.m. at “Lighten Up, Arlington!” events on the following dates.


News

A couple weeks after a tongue-in-cheek installation called attention to safety concerns on S. Carlin Springs Road, Arlington County hosted an open house last night (Tuesday).

The theme of the event: safety along Carlin Springs.


News

A new analysis of incidents where people were nearly hit with a vehicle finds that “failure to yield” is the No. 1 risk factor in Arlington.

The study by Northern Virginia Families for Safe Streets, a pedestrian safety advocacy group, found that roughly 70% of responses listed this issue as the top cause of “near misses,” followed by speeding and obstructed bike lanes.


News

Falls Church is attempting to move forward with a project to improve pedestrian and bicyclist access along W. Broad Street.

The multimodal improvement project calls for widening sidewalks, redesigning intersections and adding a new pedestrian crosswalk, with changes planned at the intersections of W. Broad Street and Virginia Avenue, Lee Street, Oak Street, Spring Street and West Street.


News

Arlington is poised to accept $18 million in funding for a pedestrian bridge connecting Crystal City to Reagan National Airport.

A funding allocation from the Northern Virginia Transportation Authority is slated for consideration at an Arlington County Board meeting this Saturday. Construction on the project, dubbed the CC2DCA multimodal connection, is expected to begin in Fiscal Year 2028.


News

Starting next month, weekday drivers and pedestrians like should plan for sporadic closures near the Shirlington Road bridge.

Kicking off in April and lasting through the summer, the sidewalk and westbound lane on S. Arlington Mill Drive will see intermittent closures on weekdays, from 9 a.m. to 4 p.m., due to the construction of a new $1.6 million pedestrian bridge.


News

Safety concerns about crash-prone S. Carlin Springs Road dominated an Arlington County Board discussion on speed limit reductions yesterday (Tuesday).

The stretch of Carlin Springs south of Arlington Blvd saw a total of 92 crashes, including three involving severe injuries or deaths, between 2016 and 2021, according to a county study. However, it is not among the five other roads, including part of N. Carlin Springs, that are expected to have speed limits reduced from 30 to 25 mph.


News

Arlington County aims to begin construction on a new traffic light at a crash-prone intersection near Barrett Elementary School this summer.

The county expects to complete the installation of the 4-way traffic signal — at N. Park Drive and N. George Mason Drive, in front of the Lubber Run Community Center — by the end of 2024. The intersection in the Arlington Forest neighborhood will also get curb extensions on all corners, increased street lighting and marked crosswalks, according to the county.


News

This spring, drivers may notice the county testing out a new road treatment to reduce speeding through left turns.

In the next month or two, the county will start installing small raised bumps called hardened centerlines along the yellow centerline at five local intersections. That’s according to Christine Baker, who coordinates Arlington’s Vision Zero efforts, which aim to eliminate road deaths and serious injuries by 2030.


News

(Updated at 12:30 p.m.) Arlington County is home to one of the busiest Goodwill donation centers in the country and this location, on S. Glebe Road, is now being teed up for redevelopment.

Last week, Planning Commission members recommended the Arlington County Board approve plans from Goodwill and affordable housing partner AHC to redevelop its storefront with a 6-story building consisting of a new retail and donation center, 128 units of affordable housing and space for a child care center.


News

Wider sidewalks, additional turning lanes and changes to bus stops are part of a newly released plan to make a busy stretch of Glebe Road safer.

The Virginia Department of Transportation on Monday announced possible changes to 2.4 miles of Glebe Road between Columbia Pike and I-66.


News

Sometime next year, three residential streets in Arlington without sidewalks could get upgrades to allow for safer pedestrian and cyclist use.

To help address demonstrated safety and access issues on S. Lynn Street, N. Wakefield Street and 12th Street S., Arlington County’s Neighborhood Complete Streets Program is considering piloting “shared streets.”


View More Stories