News

This weekend, the Arlington County Board is set to consider a proposal to funnel nearly $400,000 into the second phase of the Bluemont Junction Trail safety project.

Phase 2 includes moving and updating three trail connectors to be accessible to people with disabilities and improving cyclist and pedestrian intersections between the W&OD Trail and the Four Mile Run Trail on both sides of Wilson Blvd, per a county report.


News

The Arlington County Board is set to update the rules of the road to align with a new state law aimed at improving pedestrian safety.

This weekend, the Board is set to enact changes to local ordinances requiring drivers to stop for pedestrians in crosswalks. These changes were advertised this summer.


News

Plans to build the future pedestrian bridge from Crystal City to National Airport are firming up.

A new report outlines the impact the bridge could have on the environment. It also details how the project will relate to separate plans to redo roadways and add more parking, new car rental facility and office space.


News

The pedestrian experience is set to improve in nearly a dozen spots across the county.

The Arlington County Board this weekend is expected to approve two projects for accessibility improvements, along the Rosslyn-Ballston corridor and in three residential neighborhoods.


News

In a bid to increase pedestrian safety, Arlington County may require drivers stay stopped for longer at crosswalks.

The Arlington County Board is set to consider on Saturday changing its code so that drivers will have to stop when a pedestrian enters an adjacent travel lane and heads their way. Currently, drivers need only yield right of way when a pedestrian enters their lane.


News

Redevelopment plans for a Holiday Inn and office building in Ballston are headed to the Arlington County Board for approval.

The developers, Hoffman & Associates and Snell Properties, intend to replace the hotel (4600 Fairfax Drive) and Arlington Center Building (4610 Fairfax Drive) with a seven-story, 432-unit apartment building and two five-story, 15-unit buildings.


News

Arlington County is working on a replacement for the two bridges over Lubber Run destroyed in severe flash flooding four years ago.

The Arlington County Board is set to discuss a $360,000 construction contract for a new pedestrian bridge at its meeting this weekend.


News

Arlington County has converted two intersections near Nottingham Elementary to four-way stops, in the wake of last year’s fatal crash on Little Falls Road.

In October, a driver struck and killed a woman at the intersection of Little Falls and John Marshall Drive. She was the third pedestrian killed along a two-block stretch of Little Falls Road near the school over the past eight years.


News

A plan for a pedestrian bridge between Crystal City and Reagan National Airport is headed to the Arlington County Board for endorsement this weekend.

Specifically, the Board is set to bless a girder-style bridge that will connect a future southern entrance to the Virginia Railway Express station at 2011 Crystal Drive to the airport’s Terminal 2. It is also slated to approve more funding for an engineering firm to further develop designs for the bridge, dubbed the CC2DCA multimodal connection.


News

Arlington County is looking to make a three-block stretch in Courthouse safer for pedestrians, cyclists and motorists.

Specifically, it is looking for ways to improve conditions along a three-block stretch of Wilson Blvd and Clarendon Blvd between N. Uhle Street and N. Adams Street.


News

The County Board is set to vote this weekend on a contract to build a long-awaited pedestrian bridge.

On Saturday, it is expected that the Arlington County Board will approve a $1.6 million contract to construct the Shirlington Road Pedestrian Bridge. The 15-foot-wide prefabricated steel bridge will run the length of Four Mile Run and parallel to the road with the purpose of providing safer bicycle and pedestrian access.


Around Town

(Updated at 3:25 p.m.) A public green space with a play area for kids is now open at Clarendon’s outdoor shopping center.

The Loop, a central green space in the middle of the Crossing Clarendon, officially opened on Friday, a spokesperson confirmed to ARLnow. Several readers sent tips and photos of locals enjoying themselves in the new public park at 2800 Clarendon Blvd late last week.


View More Stories