News

Family Surprised to Learn Pet Was a Snapping Turtle — “An Arlington family took in a box turtle to be the new family pet recently — only to find out that it was actually a snapping turtle. The Animal Welfare League of Arlington tweeted out a photo of the turtle, noting that their officers had seized the turtle from the unwitting family.” [Patch, Twitter]

APS Delays Release of Construction Cost Report — “Arlington residents will have to wait a little longer for an analysis of the reasons behind the high costs of school construction in the county. The audit committees of the County Board and School Board had been slated to meet Aug. 7 in a joint session to discuss a report by school-system auditor John Mickevice on school-construction costs. That meeting, however, was called off.” [InsideNova]


Schools

Plans for a new elementary school on the Reed School property in Westover are coming into focus.

The School Board got its first look at new design renderings for the building Tuesday (July 17), which is set to open in time for the 2021 school year and serve at least 725 students in all.


Schools

(Updated at 4:40 p.m.) Arlington school leaders believe they’ll need plenty of help from the County Board to build enough schools to keep pace with a rapidly growing student body over the next decade — but the county’s own financial pressures will likely limit just how much it can lend a hand.

The School Board and County Board convened for a joint meeting on Tuesday (May 29) as officials pull together their respective capital improvement plans, documents outlining construction spending over the next 10 years, in order to better coordinate the process.


Schools

The Arlington School Board viewed the proposed concept design for a new elementary school in Westover last week.

With a desired opening date of September 2021, the 725-seat elementary school at the Reed School site has a total project cost estimate of $55.1 million, which is about $6 million more than what was approved by the School Board on June 16, 2016.


News

Voting Now Underway — Voters in Virginia have started heading to the polls to vote in a number of local and statewide races, including the competitive, nationally-significant race for governor. In Arlington, races for County Board, School Board and the House of Delegates are on the ballot. [WAMU, InsideNova]

Arlington Man Loses 45 Lbs Hiking — An Arlington accountant, 27, took 5.5 months off of work to hike the entire length of the Appalachian Trail. He lost 45 lbs in the process and was the subject of a magazine feature. [Washingtonian, People]


News

Making the Case for Amazon in Crystal City — Amazon’s planned second headquarters would find a good home in Crystal City, according to Washingtonian magazine writer Dan Reed. He said the combination of a major airport close by, good transit links from Metro and the fact that it remains “underutilized” after Base Realignment and Closure makes it an attractive option. Reed also suggested Poplar Point on the Anacostia waterfront in D.C. or the Discovery District in College Park, Md. as other places that fit the bill. [Washingtonian]

More Than 40 Drone Flights Detected at Fort Myer — A study to detect unmanned aircraft found that 43 drone flights were picked up over Fort Myer over a 30-day period beginning in August. It is in the middle of a no-drone zone, with flights requiring specific permission from the Federal Aviation Administration. The report suggests the flights could have been from “well-intentioned” tourists at the nearby Arlington National Cemetery and other National Parks. [WTOP]


Schools

A working group will soon begin evaluating the Arlington Career Center and planning for more high school seats there — and even looking into the possibly of a new comprehensive high school on the site.

The Career Center (816 S. Walter Reed Drive) is set for a renovation and an addition of 700-800 high school seats in time for 2022. The Arlington School Board voted in June to use it alongside the Education Center to add 1,300 high school seats, in a so-called “hybrid” option.


Around Town

Work to rebuild the Wilson School in Rosslyn could cause some inconveniences for those in the area as crews closed a sidewalk and street near the project.

Due to construction at the school at 1601 Wilson Blvd, 18th Street N. is closed to non-construction traffic between N. Quinn Street and N. Oak Street for the entirety of the project.


Schools

Construction crews have moved in and are well on the way to demolishing the former Wilson School in Rosslyn to make way for the future H-B Woodlawn and Stratford programs.

As of Thursday, very few walls from the school at 1601 Wilson Blvd were remaining, with piles of rubble, metal and bricks piling up as workers continue to clear the site. Construction on the new $100 million building is set to start later this year.


Schools

Arlington Public Schools will add 1,300 high school seats across the Education Center and the Career Center after the School Board approved the so-called “hybrid option” at its meeting Thursday.

The option, put forward by Superintendent Patrick Murphy last month, would add 500-600 seats to a renovated Education Center (1426 N. Quincy Street) by 2022, then add another 700-800 at the Career Center (816 S. Walter Reed Drive), which would get a renovation and an addition. The County Board denied a request to designate the Education Center as a historic district last month.


Schools

A plan to designate one of the potential sites for a new public high school as a historic district will be discussed by the County Board tonight (Tuesday).

But the proposal has drawn skepticism from county and Arlington Public Schools staff, who want the Board to deny the request and instead help preserve flexibility for APS as it solves its capacity issues.


View More Stories