The sidewalk is being built along the north side of a five block stretch of 8th Street S., between S. Cleveland Street and S. Courthouse Road. Before the project, only two of the blocks had sidewalks, and those sidewalks were narrower than Americans with Disabilities Act (ADA) requirements.
Now, the street is getting a five foot wide, ADA-compliant sidewalk, plus water main upgrades, curb and gutter improvements, new landscaping and a repaved roadway. But while the sidewalk was requested by the Penrose Civic Association, not everybody who lives in the area has been happy with the project.