News

Lee Highway Pedestrian Bridge Approaching Final Design

Refinements are being made to a plan to build a pedestrian and cyclist bridge in East Falls Church, which has undergone big changes in the past few months.

A previous version came under fire earlier this year for what critics viewed as a negative impact on the surrounding neighborhood and a perceived lack of community input, as well as design concerns. In previous renderings, the bridge had a trussed roof and was dark red.

The Virginia Dept. of Transportation has proposed building a new bridge over Lee Highway near the W&OD trail as part of its “Transform 66” interstate widening and tolling project.

If built, VDOT says the bridge would improve safety for pedestrians and cyclists. The trail currently crosses Lee Highway at the busy intersection with Fairfax Drive.

Now, the bridge has no trusses along its top and is instead what Amanda Baxter, special projects development manager at VDOT, described at a meeting Tuesday as an “earth tone gray.” Baxter said other refinements include shaped fencing and renderings showing nearby landscaping, as well as locations for relocated trail shelters to provide a rest area for all users.

She added that the lighting on the bridge is still up for discussion. Currently, the bridge has acorn-style lights in its center that would be maintained by Dominion Virginia Power. VDOT and local residents agree the lights could be better, but they are limited to lights in Dominion’s inventory.

Baxter said the Northern Virginia Regional Parks Authority, which owns land nearby, is instead willing to help out with maintaining different lights.

“I think they’ve heard you too and are willing to step up and look to other options they can maintain,” she said.

Also still up for discussion are the installation of noise walls at certain areas along I-66, which VDOT is required to offer to provide under federal law if the noise level goes higher than 66 decibels.

Neighbors who would directly benefit from the walls would be balloted on whether they should be installed, Baxter said, although some attendees raised concerns about the walls appearing to enclose the neighborhood behind them and block light.

And local resident Sandy Chesrown, representing the Lee Highway Alliance, said the group would continue to push for public art to be installed nearby.

“We see this as a gateway statement to Falls Church and Arlington County, and we will continue to lobby for some sort of public art,” she said.

VDOT plans to award a design/build contract for the entire “Transform 66” project, including constructing the bridge, at the end of this year. Building work is projected to take from mid-2018 until 2021.