Around Town

Giant ‘Moon’ Part of Continuing Central Place Construction in Rosslyn

Update at 5:20 p.m. — This article has been updated to reflect a CEB spokeswoman’s request that we no longer refer to the company as “Corporate Executive Board.”

A ten-foot-tall, 1,300 pound “moon” has been gracing the Rosslyn skyline for the past two weeks.

The moon, which is illuminated with 936 LED lights, can be seen hanging from a crane that’s part of the Central Place construction project on N. Lynn Street. It was first lit up on Sunday, Sept. 13.

The temporary public art project is the brainchild of Brian Coulter, Managing Partner of Central Place developer JBG.

“[Coulter] and JBG team members worked with Los Angeles-based Custom Prop Shop, which created the prototype design and fabricated it from steel and a fibrous resin in a nearly year-long process from idea to installation,” according to a press release. “The moon will be suspended from the rear span of a Miller and Long Co. crane during construction, for about a year.”

Construction on the Central Place project is continuing at a steady clip. The development consists of CEB Tower, a 350,000 square foot office tower at the corner of Lynn Street and Wilson Blvd; a public observation deck; a 17,000 square foot public plaza; 45,000 square feet of street-level retail space; and Central Place Residences, a 377-unit residential tower.

So far, the office tower — the future global headquarters of CEB, formerly known as Corporate Executive Board, a publicly-traded company that’s currently based down the street in Rosslyn — is still just a big hole in the ground. The steel-and-concrete frame of the residential tower, however, is now several stories high and seemingly getting taller by the week.

A spokeswoman for JBG said construction crews are currently pouring concrete on the 8th floor of the residential building and expect the “topping out” to take place by the second quarter of 2016. Completion of the building is scheduled for early 2017.

Crews are currently working on the garage levels of the office tower, the spokeswoman said. A topping out for the office tower — the point at which the top floor of the unfinished building is in place — is expected by the end of 2016. CEB is expected to move in at the beginning of 2018. The observation deck is also slated to open in early 2018.