News

A 22-story apartment building could arrive soon in Crystal City at the Century Center office and retail complex.

The building, with the address of 2351 Jefferson Davis Highway but located at the intersection of Crystal Drive and 23rd Street S., is set for 302 apartments on top of a podium of the existing two-story retail space. The Arlington County Board is set to vote on the plan by developer Lowe Enterprises on Saturday (July 15).


News

A plan to host a polling place at a condo building in Crystal City has been nixed, but elections officials said they are confident of finding a new location before November.

County staff had planned to move the polling station for the Crystal City 006 Precinct to the Crystal Gateway condo building at 1300 Crystal Drive from Crystal Place (1801 Crystal Drive) in time for November’s elections.


Feature

Construction at luxury apartment complex Ten at Clarendon will continue until September, but prospective renters can now tour apartments with the use of virtual reality.

In a partnership with Immerse Virtual Reality Nation, developer CRC Companies is launching a fully immersive virtual reality apartment tour of the new apartments at 3110 10th Street N. The 143-unit complex is expected to be completed this fall.


News

Alamo Drafthouse Coming to Crystal City — An Alamo Drafthouse Cinema will be coming to Crystal City to anchor a residential redevelopment by the JBG Smith. The redevelopment will convert the aging office building at 1750 Crystal Drive to a gleaming glass-and-metal residential building while topping it with a six-story addition. Also planned is an as-yet unsigned “specialty grocer” — think: Trader Joe’s or something similar. [Washington Business Journal]

Home Prices Rise in Arlington — “Long & Foster Real Estate Inc. says the median selling price in Arlington County last month was $613,500, up 15 percent from May of 2016. The change was based on 350 closed sales in Arlington in May.” [WTOP]


Around Town

Work at a new Potomac Yard apartment building set to include a new church is well underway.

The County Board approved the addition of a church to the first and second floors of the 12-story residential building in 2015. The building was originally approved in 2007 but went unbuilt for some time.


News

(Updated at 3 p.m.) An under-construction replacement for the former Marymount University “Blue Goose” building in Ballston is on fire.

Firefighters are on the scene of a two-alarm apartment fire on the seventh floor of 1008 N. Glebe Road, according to scanner traffic. They’re reportedly having issues with water pressure in the building, though as of 2:55 p.m. the fire is said to have been extinguished. In addition to stairs, firefighters used a ladder truck to reach the apartment that was on fire.


News

Construction Accident in Rosslyn — An accident on the parking garage level of the construction site at the corner of Key Blvd and N. Nash Street in Rosslyn prompted a large fire department and police response this morning. A worker suffered non-life-threatening injuries in the accident, which occurred around 8 a.m., and needed to be carried via rescue basket to a waiting ambulance. The response closed lanes of Key Blvd and exacerbated traffic delays caused by construction nearby on Lee Highway.

Sex Assault Suspect May Have Tried Other Buildings — The suspect in a violent sexual assault in Rosslyn may have unsuccessfully tried to get into other Arlington apartment buildings before somehow entering The Atrium building, where the assault occurred, through the front entrance, NBC 4’s Jackie Bensen reports. The suspect then knocked on doors, claiming to be a maintenance worker, before the victim opened her door and a struggle and the sexual assault ensued. [NBC Washington]


News

More on Proposed Rosslyn Residential Tower — As first reported by ARLnow.com, a residential tower is being proposed to replace the RCA office building in Rosslyn. A new preliminary site plan filing provides some additional details: it will be 24-story residential building with 407 units of both apartments and condos, plus some ground floor retail and three floors of underground parking. [Washington Business Journal]

Caucus Voting Starts Today — Voting in the Democratic caucus for County Board and School Board starts today. The first day of caucus voting will take place between 7-9 p.m. at Key Elementary School, followed by additional caucuses on May 11 and 13. ARLnow recently published “why you should vote for me” essays from each candidate. [Arlington Democrats]


News

A cavalcade of fire department vehicles descended on an under-construction apartment complex in Clarendon this morning.

A fire was reported on the fourth floor of the partially-built 10th Street Flats building at 932 N. Highland Street just after 11:30 a.m. The 143-unit luxury residential community is expected to be completed by this fall.


News

Vihstadt Wants Ads Atop Aquatics Center — County government could raise some extra money by placing corporate logos atop the future Long Bridge Park aquatics center, which could be seen by those flying in and out of Reagan National Airport, says County Board member John Vihstadt. He is also pushing the idea of ads on ART buses, transit stops and Capital Bikeshare stations. [InsideNova]

Pupatella Named Best Pizza in Va. — The expanding Pupatella Pizza has been named the best pizza in Virginia again, this time by USA Today. The Bluemont pizzeria will celebrate its seventh anniversary on Saturday. [USA Today]


View More Stories