39°Partly Cloudy

Morning Notes

Reminder: Yellow Line Shutdown Starts Today — There will be no Yellow Line service today through Sunday, Dec. 9 as Metro works to repair the Yellow Line bridge over the Potomac. Yellow Line riders can instead take the Blue Line and/or free shuttle service. [ARLnow, Twitter]

New ‘Clarendon Circle’ Traffic Restriction — Work on improvements to the busy “Clarendon Circle” intersection are underway and have resulted in at least one traffic pattern change. During construction, drivers will not be allowed to make the “tricky” left from eastbound Washington Blvd to Clarendon Blvd, and will instead have to follow a detour via N. Kirkwood Road. [Twitter, Arlington County]

Civ Fed Prepares Tree Canopy Resolution — “The Arlington County Civic Federation in December will weigh in on the development plan of Upton Hill Regional Park and, more broadly, on Arlington government policies on retaining or removing trees during redevelopment on public land. A resolution demanding a temporary halt to current development plans at Upton Hill was introduced at the Civic Federation’s Nov. 13 meeting and will be debated and voted on Dec. 4.” [InsideNova]

Minor Bluemont House Fire — Firefighters extinguished an out-of-control fire in the fireplace of a Bluemont house Saturday night. No injuries were reported but the home, on the 900 block of N. Frederick Street, suffered some smoke damage. [Twitter, Twitter]

Another Traffic Nightmare at DCA — As if the gridlock caused by the Veterans Day shutdown of the National Airport Metro station wasn’t bad enough, the traffic nightmare repeated itself Sunday evening, during one of the busiest travel days of the year. Some drivers reported spending hours trying to get to and from the airport. [NBC Washington, Twitter]

CBS Looks at Clarendon’s Vpoint Apartments — On Saturday morning, CBS News took a close look at the vPoint affordable housing project in Clarendon. The project, which converted a stand-alone church to a combination worship space and apartment building, is potentially a model for other communities struggling with affordable housing. At the time, however, the redevelopment faced lawsuits and other community opposition. [YouTube]

Amazon News Roundup — Arlington saw only modest successes in its quest to pitch itself as a tech hub over the past few years, but Amazon’s arrival changes that narrative in a big way. That said, half of the jobs Amazon brings to Arlington will be non-technical. Meanwhile, Amazon may benefit lower-income residents in New York City more than in Arlington, as subcontractors in New York will be subject to the state’s $15 per hour minimum wage; Virginia’s minimum wage is currently the federal $7.25 per hour minimum. And Nashville, some say, will be the biggest winner in terms of Amazon’s new presence boosting the local commercial real estate market.

0 Comments

Metro Plans Lengthy Yellow Line Shutdown Starting Next Week

Metro is planning a full Yellow Line shutdown starting next week, and is warning riders of hefty delays along the Blue Line the two-week-long construction work.

The rail service hoping to complete major renovation work on the Yellow Line bridge over the Potomac River, prompting the closure. In all, the work will run from Nov. 26 through Dec. 9.

“During rush hour, trains will run about half as frequently as usual, due to capacity limits at the Rosslyn tunnel,” Metro wrote in a release. “Customers may experience crowding.”

Blue Line trains will run every 16 minutes on weekdays through 8 p.m., then switch to 20-minute headways. Riders can also expect 16-20 minute headways on weekends.

The transit agency will offer free shuttle bus service to compensate for the shutdown, including:

  • Between Franconia-Springfield and Pentagon and between Pentagon and L’Enfant Plaza from opening until 8 p.m.
  • Between Franconia-Springfield and L’Enfant Plaza and between Crystal City and L’Enfant Plaza, rush hour only.

Metro is urging riders to consider Virginia Railway Express service between Franconia-Springfield, Crystal City or King Street to L’Enfant Plaza or Union Station, or local bus options instead.

The shutdown will also coincide with a weekend shutdown of five Green Line stations from Dec. 1-2, when the Navy Yard, Waterfront and Archives stations will be closed, along with the Yellow and Green Line platforms only at Gallery Place-Chinatown and L’Enfant Plaza.

This construction is Metro’s last planned major construction work of the year, and comes on the heels of a Veteran’s Day shutdown on the Blue and Yellow lines that prompted huge traffic woes for travelers hoping to reach Reagan National Airport.

Flickr pool photo by John Sonderman

0 Comments

Shutdown for Repairs Rescheduled for Metro’s Blue, Yellow Lines

A four-day construction project for Metro’s Yellow and Blue lines has been rescheduled to reduce the impact on commuters.

Work on replacing a series of switches and installing new concrete pads outside of Reagan National Airport will close the Reagan National Airport and Crystal City stations. The project was originally scheduled for Friday, Nov. 2 to Monday, Nov. 5 but has been moved to the following weekend, Metro announced today (Friday).

The stations will be closed from Friday, Nov. 9 to Monday, Nov. 12, which is Veterans Day. The change will reduce the commuting days impacted by the work from two to one.

During the closure, shuttle buses will replace trains between the Braddock Road and Pentagon City stations. Metro warned that customers on the Blue and Yellow lines will likely experience additional crowding due to less frequent service during the repairs.

Later in November, repairs to the Yellow Line Bridge will shut down the Yellow Line completely for ten days. Between Nov. 26 and Dec. 9, the Yellow Line will not be functioning and customers wishing to travel between Virginia and D.C. will need to use the Blue Line.

File photo

0 Comments

Morning Notes

County HQ to Be Named After Bozman — “The Arlington County Board today voted unanimously to name the County Office Building at 2100 Clarendon Boulevard for Ellen M. Bozman, the six-time Board Chair who served on the Board through some of Arlington’s most transformative years, and who died in 2009.” [Arlington County]

Blue, Yellow Line Service Disruption — Metrorail service on the Blue and Yellow lines was suspended earlier this morning due to “fire department activity” at the Pentagon station. Arlington County Fire Department units investigated the incident and turned the scene back over to Metro around 6 a.m. Service has since been restored. [Twitter, Twitter, Fox 5]

County Board Sets Stage for Va. Square Redevelopment — The Arlington County Board on Saturday took a first step towards the redevelopment of several properties at the corner of Washington Blvd and N. Kirkwood Road. New apartments and upgrades to the YMCA have been proposed for the site. The Board approved a General Land Use Plan Study and Concept Plan that will “serve as a long-range planning guide for potential redevelopment.” [Arlington County]

Arlingtonian Among Rhodes Scholars — Arlington native Matthew Chun, a senior at the Massachusetts Institute of Technology, has been named one of 32 Rhodes scholars in the U.S. Chun, who is also captain of the school’s wrestling team, is one of two Virginians among the latest group of Rhodes scholars. [Associated Press, MIT News]

Juvenile Hospitalized After Nauck Hit and Run — An individual under the age of 18 was reportedly struck by a car on the 2400 block of Shirlington Road, in the Nauck area, over the weekend. The car’s driver drove off after hitting the juvenile, who suffered non-life threatening injuries. [WJLA]

Nestle Lease Lauded in Commercial RE Awards — The lease of 1812 N. Moore Street in Rosslyn to serve as Nestle’s new U.S. headquarters was given the “Award of Excellence” in the Real Estate Transaction category at the 2017 NAIOP Northern Virginia commercial real estate awards. It was among six Arlington-related winners at the awards ceremony, including the new Marymount University Ballston Center development. [NAIOP]

Flickr pool photo by Chris Guyton

0 Comments

Morning Notes

Gas Leak Along George Mason Drive — Part of S. George Mason Drive near Columbia Pike was closed this morning due to a gas leak. [Washington Post]

Blue, Yellow Line Delays — A “signal problem” outside of National Airport, the site of weekend track work, caused delays on the Blue and Yellow lines this morning. [Twitter]

Bethesda Has Most Expensive One-Bedroom Apartments — Bethesda has the highest median rents for one-bedroom apartments, at $2,270, according to a new report. “In comparison, D.C.’s typical one-bedroom costs $2,260 per month, while one-bedroom rents in Arlington, Virginia, cost a median of $2,140 per month.” [Curbed]

Remembering Hoover Field — A pair of airports, Hoover Field (later Hoover Airport) and Washington Airport, operated during the 1920s and 1930s on the site of the present day Pentagon reservation. National Airport was opened shortly after both closed down to make way for the Pentagon. [Paul Freeman, Twitter]

Best Places to Watch the Marine Corps Marathon — A number of Arlington locations are listed among the best places for spectators to watch the Marine Corps Marathon. [WTOP]

Photo courtesy Peter Golkin

0 Comments

Metro’s Next SafeTrack ‘Surge’ Will Temporarily Halt Blue Line Service

Arlington Cemetery Metro station in the rain (Flickr pool photo by Brian Irwin)

Metro’s next SafeTrack “surge” will include a temporary shutdown of the entire Blue Line, starting Saturday.

Blue Line trains will not run at all between Feb. 11-28, according to Metro. Instead, Yellow Line “Rush Plus” trains will run all day between Franconia-Springfield and Greenbelt. Those trains will run in addition to regular Yellow Line trains between Huntingdon and Mount Vernon Square.

The Arlington Cemetery station will be closed and will be served by buses from the Pentagon during the latest round of maintenance work.

During rush hour, trains are scheduled to arrive every four minutes at stations normally served by both Blue and Yellow Line trains, Metro said. Orange and Silver Line trains will not be affected by the latest track maintenance effort.

Metro originally planned to only run Blue Line trains between the Franconia-Springfield and Reagan National Airport stops. But the transit agency updated that plan on Jan. 27 after concluding the original one wasn’t necessarily “in the interest of minimizing customer impact.”

“The new service plan means that riders from Virginia will experience less crowding and will be able to ride into D.C. without changing trains,” the agency said in a release.

Next month, track work will primarily affect riders heading to and from Alexandria. From March 4-26, Metro trains will share a single track on the Blue and Yellow lines between the Braddock Road and Huntington/Van Dorn Street stations. Blue Line trains will run every 24 minutes during that time, while the Yellow Line between National Airport and Mt. Vernon Square will run every 6-12 minutes, according to Metro.

From March 26 through April 2, only Blue Line Trains will share a single track. Then, from April 3-9, Yellow Line trains are slated for single-tracking.

Later this year, likely around May and June, a portion of the Orange Line between the Minnesota Avenue and New Carrollton stops is also scheduled to undergo maintenance and single tracking. The SafeTrack program is currently slated to wrap up in late June, though the final dates haven’t yet been announced.

Flickr pool photo by Brian Irwin

0 Comments

UPDATE: Metro Investigating Sexual Assault on Yellow Line Train

Suspects from a sexual assault that occurred on a Yellow Line train (photo courtesy WMATA)

(Updated at 5:25 p.m.) Metro Transit Police are investigating a sexual assault that occurred last night on a Yellow Line train.

Metro says three men assaulted a woman, grabbing her inappropriately, after she refused to perform a sexual act.

The assault took place on a train near the Braddock Road Metro station. Transit Police investigated the incident at the Crystal City Metro station Thursday night, just before 10 p.m., prompting delays on the Blue and Yellow lines.

Late Friday afternoon, Metro released a press release (below) and surveillance images of the suspects (above).

Metro Transit Police are investigating a reported sexual battery aboard a Yellow Line train last night and are seeking the public’s assistance to identify three persons of interest pictured below.

The victim, an adult female, advised officers that she was approached by three males at around 9:30 p.m. aboard a northbound train from Huntington. As the train traveled between Eisenhower Ave and Braddock Road stations, the males approached the victim and asked her to perform a sexual act. When the victim refused, the suspects assaulted the female, including grabbing her body through her clothing.

The victim reported the incident to MTPD officers who broadcast a flash lookout and conducted a canvass of trains and stations along the line. The victim declined medical assistance and was subsequently transported to her residence by MTPD officers.

The suspects were described as follows:

1. Black male (medium complexion), age 18-30, height 5’8″-5’11”, weight 140 wearing red t-shirt with “aero” logo and blue jeans
2. Black male (medium complexion), age 18-30, height 5’8″-5’11”, weight 140 wearing black t-shirt with white shirt underneath and black jeans
3. Black male (medium complexion), age 18-30, height 5’8″-5’11”, weight 140 wearing black Nike shirt with yellow “P” Pittsburgh Pirates logo and blue jeans

Anyone who may have information about this incident is urged to contact Metro Transit Police detectives by calling (202) 962-2121 or by sending a text message to “MyMTPD” (696873).

0 Comments

Morning Notes

Wet leaves in early fall, in Fairlington

Major Traffic, Metro Woes — It was extremely slow going for commuters crossing the 14th Street Bridge this morning. Wet roads and a couple of crashes backed up traffic on I-395 and feeder routes for miles. Traffic issues were also reported on Columbia Pike, due to malfunctioning traffic signals at S. Queen Street. Meanwhile, a fire response at the L’Enfant Metro station and track issues on the Yellow Line bridge have resulted in speed restrictions and delays for Yellow Line riders. [Twitter, Twitter, Washington Post]

Waiting for Joaquin — Arlington County is keeping a close eye on Hurricane Joaquin, which some models are suggesting may have a big impact on the D.C. area. [Twitter]

Cristol Touts Endorsements — Following a snub by County Board member John Vihstadt, who endorsed her Democratic ticketmate Christian Dorsey and independent candidate Mike McMenamin, County Board candidate Katie Cristol is touting her own endorsements. “Twenty elected officials, comprising all of Arlington’s School Board, Constitutional Officers and Richmond delegation, and much of the County Board, today endorsed Katie Cristol’s campaign,” the campaign said in a press release Tuesday. [Katie Cristol]

Juror Qualification Process Begins — A random selection of Arlington and Falls Church residents are being mailed juror questionnaires, which will be used to qualify residents for jury duty in 2016. [Arlington County]

Attorney General Holds Arlington Newser — Virginia Attorney General Mark Herring announced a new training initiative for police at a news conference in Arlington yesterday. The training is intended to help officers de-escalate dangerous situations, thus preventing the need to excessive use of force, while also recognizing potential biases they may bring to the job. Arlington County already conducts similar training. [NBC Washington]

0 Comments

Suspicious Note on Metro Train Prompts Investigation, Delays

Metro transit police vehicle (file photo)(Updated at 5:55 p.m.) A investigation into a suspicious message on a train caused some delays for Metro riders heading through Arlington on the Blue and Yellow lines this afternoon.

Metro Transit Police responded to the Pentagon City Metro station around the beginning of the evening rush hour for a “report of [a] suspicious package,” Metro said via Twitter.

According to Metro spokesman Mike Tolbert, a “suspicious note” was found on a train. The note was similar to another note — a bomb threat — that caused delays on the Blue, Silver and Orange lines this morning, Tolbert said.

Trains single tracked between the Pentagon City and National Airport stations for about a half hour as a result of the investigation. Metro said officers determined that the threat was “unfounded” and an all clear was given. Full service resumed, though with significant residual delays.

The incident even caused delays on the Green Line in D.C. “due to earlier congestion from delayed Yellow Line trains.”

0 Comments

Metro Places Speed Restriction on the Yellow Line Bridge

View of D.C., the 14th Street Bridge and the Yellow Line bridge on the PotomacMetro riders who take the Yellow Line between Virginia and D.C. will see some slowdowns while crossing the Potomac River.

WMATA says it has placed a speed restriction on the bridge, limiting trains to just 15 miles per hour. The restriction is “part of Metro’s aggressive campaign to fix track conditions identified following inspections after the derailment of a non-passenger train in early August,” the transit agency said online.

Replacement of metal fasteners on the Yellow Line bridge is currently underway, Metro said, but may take 6-8 weeks.

“While it may seem like slow-going, we do not expect significant delays,” the agency said. “However, if there is another issue such as a disabled train, switch problem or medical emergency, the speed restriction may result in congestion prior to the speed restriction area.”

Additional 15 mph restrictions are in place on the Orange, Silver and Blue lines between Foggy Bottom and Farragut West, and in three sections on the Red Line. Readers and an ARLnow.com reporter have also observed trains running slowly in a portion of the tunnel between Rosslyn and Foggy Bottom.

In addition to the slow restrictions, Metro says it has also placed “medium restrictions” of up to 40 mph in certain parts of the Metrorail system.

NBC Washington’s Adam Tuss first reported the Yellow Line bridge speed restriction this morning and posted a video showing a slow-moving train on the bridge.

0 Comments

Morning Notes

Fall foliage outside a house in Arlington (Flickr pool photo by Wolfkann)

Board to Consider Mall Expansion Plan — The Arlington County Board is expected to vote on the Fashion Centre at Pentagon City’s expansion plans at its Saturday meeting. County staff is recommending approval of the plan, which would about 50,000 square feet of space for 5-7 new retail tenants to the front of the mall.

Shopping Center Cost $250k in 1940 — The strip mall at the northeast corner of Columbia Pike and Glebe Road represented an investment of $250,000 in 1940. At the time, traffic volume on Columbia Pike was about 12,000 cars per day and traffic volume on Glebe Road was about 600 cars per day. [Ghosts of DC]

Reminder: Yellow Line Closed This Weekend — The Yellow Line will be shut down this weekend for the annual safety inspection of the Yellow Line bridge over the Potomac River. The closure will begin at about 10:00 tonight (Friday).

Optimist Club Christmas Tree Sale Two Weeks Away — The Optimist Club of Arlington will kick off its annual Christmas tree sale on Saturday, Nov. 30. The sale will be held in the Wells Fargo parking lot at the corner of Lee Highway and Glebe Road. [Sun Gazette]

Flickr pool photo by Wolfkann

0 Comments

Yellow Line to Shut Down This Weekend

Pentagon City Metro stationArlington residents who take the Yellow Line to and from the District will have to take the Blue Line instead.

Metrorail service on the Yellow Line will be suspended from 10:00 p.m. Friday through system closing on Sunday, to allow the annual safety inspection of the Yellow Line bridge over the Potomac River.

Yellow Line riders in Virginia are instead advised to take the Blue Line, which will run at normal weekend intervals.

Orange Line riders, meanwhile, will be subject to delays this weekend. Orange Line trains will run every 20 minutes, starting Friday night at 10:00, due to track work and platform reconstruction at the Minnesota Avenue and Deanwood stations.

0 Comments

Veterans Day Weekend Track Work on Metro

metro2Leave some extra time if you plan to use Metro this Veterans Day weekend, because there will be longer than usual intervals between trains.

Orange, Yellow and Blue Line trains will all arrive every 20 minutes, beginning at 10:00 p.m. on Friday, November 8, and continuing through closing on Monday, November 11. All Yellow Line trains will run only between Huntington and Mt. Vernon Square.

The system opens at 5:00 a.m. on Monday and will close at midnight. Additional trains will operate on Monday between Vienna and Stadium-Armory from 6:30-9:30 a.m. and 3:30-6:30 p.m.

Crews working on the Yellow and Blue Lines will improve track infrastructure, including installation of new ties, fasteners, insulators, grout pads and cover boards. Orange Line workers will reconstruct station platforms at Minnesota Avenue and Deanwood stations, as well as performing tie renewal, insulator renewal and structural improvements.

More information about weekend schedule alterations throughout the Metro system can be found on the WMATA website.

0 Comments

DCA, Crystal City Metro Stations to Close this Weekend

metro2(Updated at 4:10 p.m.) Work on the Metrorail system this weekend will affect all of the lines that travel through Arlington, including shutting down the Reagan National Airport and Crystal City stations. Disruptions begin at 10:00 p.m. on Friday, September 13, and continue through closing on Sunday, September 15.

Blue line trains will operate at regular weekend intervals (every 12 minutes during daytime hours, and every 15-20 minutes at other times) in two segments: between Largo Town Center and Pentagon City, and between Franconia-Springfield and Braddock Road. Yellow Line trains will also operate at normal weekend intervals in two segments: between Mt. Vernon Sauare and Pentagon City, and between Huntington and Braddock Road.

Customers on the Blue and Yellow lines will need to take free shuttle buses between Pentagon City and Braddock Road while the two stations are closed. Express buses will operate non-stop between Braddock Road and Pentagon City. Customers should add up to 15 minutes of travel time. Local buses will operate between Braddock Road and Pentagon City, making intermediate stops at Reagan National Airport and Crystal City stations. Customers should add up to 20 minutes of travel time.

Riders should note that there are also alterations to the times for final trains. The last Yellow Line train from Huntington to Braddock Road will depart 22 minutes earlier than normal to allow for shuttle bus connections. It will depart at 2:12 a.m. on Friday and Saturday nights, and at 11:12 p.m. on Sunday. The last Blue Line train from Franconia-Springfield to Braddock Road will also depart 22 minutes earlier, at 2:07 a.m. on Friday and Saturday nights and at 11:07 p.m. on Sunday.

WMATA says the closures are due to crews replacing junction boxes and performing various maintenance and rehabilitation tasks.

Due to work in the District, customers riding the Orange Line this weekend should expect trains to come at 20 minute intervals.

More information about all of the work on the Metrorail system this weekend can be found on WMATA’s website.

0 Comments

Two Orange Line Stations Closed this Weekend

Metro logoAfter a month-long hiatus from performing track work, Metro workers will be back at it this weekend. The Courthouse and Clarendon stations will close for the maintenance.

The stations will close beginning today at 10:00 p.m. and running through closing on Sunday. The closures allow for track circuit replacement, which is a safety measure recommended by the NTSB.

Trains will operate every 15 minutes in two segments: between Vienna and Virginia Square, and between Rosslyn and New Carrollton. There will be free shuttle buses to take passengers between stops from Virginia Square to Rosslyn. Customers using the shuttles should add 15 minutes to their travel time.

To allow for shuttle bus connections, the last train from Vienna to Virginia Square will depart 31 minutes earlier than normal on Friday, Saturday and Sunday nights. The train will leave Vienna at 2:05 a.m. on Friday and Saturday, and at 11:05 p.m. on Sunday.

Riders on the Blue and Yellow lines should also expect delays. Trains will be single tracking between Braddock Road and Pentagon City due to maintenance such as rail tie, fastener and insulator renewal. Blue and Yellow trains will operate every 30 minutes.

0 Comments
×

Subscribe to our mailing list