News

Four Designs For Long Bridge Park Aquatics Center Released

The four possible designs for the next phase of the Long Bridge Park Aquatics Center have been released.

The revamped center at 475 Long Bridge Drive will have a 50-meter pool; diving platforms from one, three and five meters up; a family pool; and health and fitness spaces. The contractor can then add extra features from a “menu” of potential options, so long as it stays within budget.

That “menu” could include advanced energy efficiency, a therapy pool, a 10-meter dive tower and more spectator seats, among other enhancements.

The project, plagued by a years-long delay caused by anticipated cost overruns has a scaled-down aquatics and fitness center from previous plans. The county will be using a design-build approach, which keeps costs down by establishing a budget at the start that the contractor must not exceed.

“We are incredibly excited about these designs,” County Manager Mark Schwartz said in a statement. “We’ve got four nationally recognized design and construction firms who are putting together their best ideas, based on their creativity and knowledge, for project options for Arlington. By using the Design-Build method, we can focus on the community’s needs while completing the project within budget.”

Links to videos showcasing the designs of the four bidders are below.

Members of the public can give feedback on the four design concepts in several ways between now and October 29:

  • Attend a public event on Thursday, October 19 from 7-10 p.m. at 2011 Crystal Drive, 11th Floor. Watch the presentations, ask the firms questions and share feedback.
  • Visit the Courthouse Plaza lobby (2100 Clarendon Blvd.) from 8 a.m. to 7 p.m. on weekdays (from October 19 to 29) to watch the videos of the designs, view schematic drawings and share feedback.
  • Starting today, go online to watch the videos of the designs and share feedback.

Following community feedback, the park’s Selection Advisory Committee will recommend the contract award based on written proposals, interviews, review of concepts, public feedback and negotiations.

The firm that is awarded the contract will complete its design and construction documents next year, with construction set to start as early as next July.