The $29.5 million endeavor will replace the existing bridge — built in 1941 and now “considered structurally deficient,” according to the Virginia Department of Transportation — with a new structure that expands the shared-use path to 14-feet wide, add an 8-foot sidewalk and is longer, wider and taller than the existing bridge.
While construction has begun, traffic impacts won’t start until May.