Around Town

Ballston Pedestrian Bridge Demolition Begins Soon

The long-planned demolition of the pedestrian bridge over Wilson Blvd in Ballston should begin soon, according to a spokeswoman for the developer.

The bridge between Ballston Common Mall and 4201 Wilson Blvd — which houses the soon-to-be-relocated National Science Foundation — closed last year as part of the mall’s renovation.

An anonymous tipster reported seeing bricks being removed at the base of the bridge’s pillars where it connects to the mall, and wondered if demolition was beginning.

But a spokeswoman for developer Forest City, which is carrying out the mall’s revamp, said last week it is not doing any work on the bridge at this time. She added that demolition is scheduled to start soon.

“We are not doing any construction on the structural components that would affect the bridge,” the spokeswoman said. “The demolition should begin within the next 30 days, but we will notify the public once we have a solid date.”

The bridge is still on track to be reconstructed and reopened in time for the revamped mall’s opening in fall 2018.