Traffic is very slow on the entire length of westbound I-66, from Rosslyn to the Toll Road. The backups are so bad that there are reports that ancillary backups have formed on some main local roads that connect with I-66 on-ramps, like Sycamore Street, Washington Boulevard and Glebe Road. Route 110 is also said to be jammed as a result of the I-66 traffic.

Via Twitter, several I-66 commuters have said that the slow traffic has added 30 or more minutes to their westbound commute.


Local authorities are warning of possible rush hour traffic impacts as a result of today’s scheduled Occupy NoVA and Occupy D.C. marches to the Key Bridge.

The District Department of Transportation (DDOT) and the Metropolitan Police Department (MPD) are advising the public about the possibility of traffic delays during the evening rush hour today (17 Nov) due to a planned demonstration and march by Occupy DC in the vicinity of the Key Bridge and McPherson Square.


A ceremony is being held by the Ronald Reagan Presidential Foundation to commemorate the statue unveiling, in front of the airport’s Terminal A.

Drivers should expect heavier-than-usual traffic around the arrivals and departures terminals due to lane closures for the event, airport officials said. Four lanes will merge into one to detour around the event site. There’s also a possibility that traffic will be completely blocked for short periods along the detour route.


The tricky merge from eastbound Columbia Pike to northbound Washington Boulevard has been made even trickier recently due to high grass.

The merge, which lacks an acceleration lane to get up to the speed of fast-moving traffic on Washington Boulevard, has been the scene of numerous fender benders. While it was still hard for drivers to see oncoming traffic when the grass was mowed, cab drivers tell us that it’s now even harder.


The intersection, which sits between two existing sets of traffic lights at Four Mile Run Drive and at S. Dinwiddie Street, is adjacent to the under-construction Arlington Mill Community Center and a future 122-unit affordable housing complex.

On its web site, Arlington County says the new traffic signals — which haven’t been switched on yet — are necessary because of construction. Don’t expect the lights to stay on for long, though. Arlington Mill Drive is expected to be closed during the latter stages of the community center’s construction.


View More Stories