News

Plans for the redevelopment of a seven-acre site in Virginia Square — which include a new apartment building, YMCA facility and affordable housing — are slated to come before the Arlington Planning Commission this fall.

The plans, for several properties around the intersection of Washington Blvd and N. Kirkwood Road, could result in a new six-story apartment building; a rebuilt, 100,000 square foot YMCA building; and a 161-home affordable housing project. The plans call for retaining American Legion Post 139 on the property.


Around Town

A new wine store and gourmet shop is coming to Pentagon City, according to a Virginia ABC application.

The store, called Pentagon City Wine Merchant in the application, would be located at 1330 S. Fair Street, near The Millennium at Metropolitan Park apartment building and across from Costco.


Around Town

Construction crews have demolished the Cherry Hill Apartments just off Lee Highway, and a new four-story building is set to replace it.

The three-story garden apartments at 2110-2120 N. Monroe Street in Cherrydale have been razed, as well as two single-family homes next door. The former building had 77 units and was built in 1961 near a Safeway grocery store.


News

A 22-story apartment building has the go-ahead to start construction in Crystal City after the Arlington County Board unanimously approved the project at its Saturday meeting.

The building, with the address of 2351 Jefferson Davis Highway but located at the intersection of Crystal Drive and 23rd Street S., is set for 302 apartments on top of a podium of the existing two-story retail space. The building is part of the larger Century Center office and retail complex.


News

A 22-story apartment building could arrive soon in Crystal City at the Century Center office and retail complex.

The building, with the address of 2351 Jefferson Davis Highway but located at the intersection of Crystal Drive and 23rd Street S., is set for 302 apartments on top of a podium of the existing two-story retail space. The Arlington County Board is set to vote on the plan by developer Lowe Enterprises on Saturday (July 15).


News

A plan to host a polling place at a condo building in Crystal City has been nixed, but elections officials said they are confident of finding a new location before November.

County staff had planned to move the polling station for the Crystal City 006 Precinct to the Crystal Gateway condo building at 1300 Crystal Drive from Crystal Place (1801 Crystal Drive) in time for November’s elections.


Feature

Construction at luxury apartment complex Ten at Clarendon will continue until September, but prospective renters can now tour apartments with the use of virtual reality.

In a partnership with Immerse Virtual Reality Nation, developer CRC Companies is launching a fully immersive virtual reality apartment tour of the new apartments at 3110 10th Street N. The 143-unit complex is expected to be completed this fall.


News

Alamo Drafthouse Coming to Crystal City — An Alamo Drafthouse Cinema will be coming to Crystal City to anchor a residential redevelopment by the JBG Smith. The redevelopment will convert the aging office building at 1750 Crystal Drive to a gleaming glass-and-metal residential building while topping it with a six-story addition. Also planned is an as-yet unsigned “specialty grocer” — think: Trader Joe’s or something similar. [Washington Business Journal]

Home Prices Rise in Arlington — “Long & Foster Real Estate Inc. says the median selling price in Arlington County last month was $613,500, up 15 percent from May of 2016. The change was based on 350 closed sales in Arlington in May.” [WTOP]


Around Town

Work at a new Potomac Yard apartment building set to include a new church is well underway.

The County Board approved the addition of a church to the first and second floors of the 12-story residential building in 2015. The building was originally approved in 2007 but went unbuilt for some time.


News

(Updated at 3 p.m.) An under-construction replacement for the former Marymount University “Blue Goose” building in Ballston is on fire.

Firefighters are on the scene of a two-alarm apartment fire on the seventh floor of 1008 N. Glebe Road, according to scanner traffic. They’re reportedly having issues with water pressure in the building, though as of 2:55 p.m. the fire is said to have been extinguished. In addition to stairs, firefighters used a ladder truck to reach the apartment that was on fire.


View More Stories