News

The County Board voted this weekend on an agreement with the City of Alexandria to dredge Four Mile Run in order to help mitigate flooding.

The neighboring jurisdictions will split the costs related to permitting, designing, construction, and dredging Four Mile Run, from around I-395 to the Potomac River.


News

(Updated at noon) The new W&OD Trail bridge over Lee Highway in East Falls Church is now open.

VDOT announced the opening of the $6 million bridge Friday morning, touting “a safer, faster crossing over busy Route 29.” Previously, trail users would have to wait to cross Lee Highway at a crowded intersection, next to ramps to and from I-66 and Washington Blvd.


News

(Update 4:25 p.m.) Metro is fast-tracking repairs on the Yellow Line bridge and tunnels.

The transit agency is preparing for a major capital project to rehab the 3,000-foot-long Yellow Line bridge that crosses over the Potomac River, connecting D.C. to Arlington.


News

(Updated at 11:05 a.m.) A new name is on the horizon for the elementary school at the Reed site in Westover, which is under construction and slated to open in August.

A naming committee, formed in January, is asking students, parents, staff and community members to narrow down five possible names: Cardinal, Compass, Exploration, Kaleidoscope and Passport. Respondents can pick their top three and share their perspectives.


News

Construction has started in Ballston on the future site of a new Harris Teeter, three apartment buildings and a new green space.

Excavation and sheeting and shoring work started this past week at 600 N. Glebe Road, said Mary Senn, the vice-president of Georgia-based developer Southeastern Real Estate Group, LLC, the developer overseeing the project.


News

New Arlington construction is helping the Commonwealth become more green.

Virginia is ranked eighth in the country for LEED-certified space per capita, the U.S. Green Building Council announced earlier this month. This is in large part because of Arlington County, which accounted for more than 15% of the newly LEED-certified buildings in the state in 2020.


News

Arlington County is looking to overhaul the reversible lanes and the triangle-shaped intersection at Washington Blvd and 13th Street N., near Clarendon.

Washington Blvd would be widened to create a four-lane road between Clarendon Circle and N. Kirkwood Road, while 13th Street N. would be realigned to form a “T” intersection with Washington Blvd, according to a county staff report.


News

Metro’s entire Blue Line is being shut down for more than three months starting Saturday.

The closing of the Blue Line, which runs through parts of Arlington, is due to platform reconstruction work being performed at the Arlington Cemetery station. Additionally, work is being done at the Addison Road station in Maryland. The project was announced last year.


News

Amazon has unveiled plans for the PenPlace site in the second phase of its $2.5 billion HQ2 in Pentagon City, including a lush office building shaped like a double helix.

The company will build 2.8 million square feet of office space across three 22-story buildings, an amenity building with a community gathering space and daycare center, and three retail pavilions. The focal point will be The Helix: a 350-foot tall spiraling office building that recreates a climb in the Blue Ridge Mountains.


News

The second of two residential towers at Pentagon Centre, in Pentagon City, is taking shape at 15th Street S. and S. Hayes Street.

This past spring, work began on The Milton, an 11-story building with 253 residential units and 15,541 square feet of ground-floor retail. It follows on the heels of a 26-story, 440-unit residential tower with 7,000 square feet of ground-floor retail called The Witmer (710 12th Street S.), which opened in July 2019.


News

DCA Expansion to Open Mid-2021 — “The 230,000-square-foot concourse on the north side of Reagan National Airport looks ready for passengers. The exterior walls are up. The roof is on. The terrazzo floor is almost in. And 11 of the 14 new jet bridges are being installed… The concourse is slated to open in July, but plans are in the works to do a ‘soft opening’ ahead of that date. An announcement is expected early next year.” [Washington Post]

Local Homeless Org Seeking Donations — “An organization in Arlington who helps the homeless now needs your help. Bridges to Independence in Arlington is a family shelter that has had to reduce the number of people they help due to COVID, but the need for help remains high. ‘We’ve served at least 22 new families since the pandemic and we are expecting an increase going into the new year,’ Whitfield said. [WJLA]


News

Construction has wrapped up on one of Amazon’s new, temporary office buildings in Crystal City.

The renovation project, part of developer JBG Smith’s extensive development plan for the area, helped to modernize the office building’s 273,000 square feet of space while giving the exterior a shiny new glass-and-steel look.


View More Stories