News

The Arlington Cemetery Metro station is “deteriorating” and Metro’s plan to fix it next year will cause some changes for commuters.

The platform reconstruction work is currently scheduled to take place from mid-February to May. During that time, those bound for D.C. and Maryland from the Pentagon and stations to the south will be served only by Yellow Line trains and the Yellow Line bridge.


News

(Updated 12 p.m. 02/24/21) Early stages of construction have started on the future site of a new Harris Teeter, three apartment buildings and a new green space in Ballston.

Utility relocation and demolition of the recently-vacated American Service Center building will soon begin at 600 N. Glebe Road, said Mark Senn, the president of Georgia-based developer Southeastern Real Estate Group, LLC, the developer overseeing the project.


News

The empty Red Cross building (4333 Arlington Blvd) in Buckingham will come down in a few weeks to make way for a new apartment building called The Cadence.

The building, developed by Wesley Housing Development Corporation, will have 97 units, all set aside for low- and moderate-income households. It is part of a complex that includes 19 nearly complete market-rate townhouses a stone’s throw away.


News

Construction activity has started on a 19-story, 306-unit residential building across from Amazon’s future HQ2 in Pentagon City.

The apartment tower is being built at 400 11th Street S., next to the DoubleTree Hotel, Lenox Club apartments, a Verizon telecommunications facility, and the recently-built Altaire apartments.


News

About Last Night’s Flyover — The two fighter jets that flew low and loud over Arlington last night, startling many, were participating in a flyover for the dedication of the new Eisenhower Memorial in D.C. [Twitter, Twitter]

Big Crane Coming to Amazon HQ2 Site — “There will be tower crane erection work this weekend, starting at 5 a.m. on Saturday, September 19 and 7 a.m. on Sunday, September 20. Work will be completed no later than 9 p.m. each day.” All southbound traffic on S. Eads Street will be detoured. [Twitter]


News

A project that is changing the skyline of Arlington has just celebrated its “topping out.”

The massive Highlands residential development in Rosslyn recently reached its full height. Construction, which has continued through the pandemic and some notable challenges, is expected to wrap up in the second half of 2021.


News

(Updated at 11 a.m.) The Arlington County Board has approved a nearly $4 million contract to plan, design and manage the construction of a new bus facility in the Green Valley neighborhood.

The Board unanimously approved the contract for a new Arlington Transit (ART) operations and maintenance facility at its Tuesday night meeting. The new facility will be built on a property along the 2600 block of Shirlington Road that the county bought for $24 million in 2018.


News

More APS Tech Issues Reported — Several people contacted ARLnow yesterday to report more technology issues involving remote learning. While Wakefield High School’s principal posted a possible fix on social media, APS spokesman Frank Bellavia said that any remaining problems were isolated: “At last check this morning, there were 25,273 APS-provided student devices active on our network. There are some issues at the secondary level, but we are working directly with those students to reset their devices.” [Twitter, Twitter]

Sept. 11 Commemoration Tomorrow — “Arlington County will commemorate the lives lost in the Sept. 11, 2001, terrorist attacks, and express gratitude to all those who responded that day with a virtual event. To ensure everyone’s safety during the COVID-19 pandemic, the public will view the event online or on the County’s cable channels.” [Arlington County]


News

A prime triangle of land in Courthouse is expected to remain largely vacant through next year.

The property at the corner of Wilson Blvd. and N. Courthouse Road once housed a Wendy’s. The fast food restaurant was torn down in 2016, in anticipation of the construction of a 12-story office building, which was approved the year before. More than four years after the demolition, however, there’s still no office building.


News

Arlington County has taken an initial step towards the construction of a new elevator for the Pentagon City Metro station.

At a recent meeting, the County Board approved a nearly $750,000 contract with a construction consultancy to manage construction of a new elevator near the Fashion Centre at Pentagon City mall. The new elevator will provide an alternative to an existing Metro elevator on the eastern side of the street, which will also receive some upgrades as part of the $5.1 million project.


View More Stories