The agency says construction on the new bridge will begin this summer and will wrap up in fall 2012 — a bit later than originally anticipated. The entire 100-foot-long bridge deck will be replaced with pre-cast concrete panels, and will be 27 feet wider than the existing bridge. The extra width will be used to install a 10-foot wide sidewalk, a 17-foot wide shared-use path and a new northbound turn lane. There will also be new traffic signals, “decorative wrought-iron picket fencing” and LED lighting.
On Thursday, June 2, at 7:00 p.m., VDOT will hold a ‘pardon our dust’ meeting for community members at Thomas Jefferson Middle School (125 S. Old Glebe Road).