Plans to redevelop an office building and the former Jaleo restaurant in Crystal City as two apartment towers are crystallizing.
But two yet-undeveloped buildings appear to be limiting plans for some transportation and open space community benefits associated with the project.
JBG Smith proposes replacing the one-story retail building at 2250 Crystal Drive — home to Jaleo until September — and the aging 11-story “Crystal Plaza 5” office building at 223 23rd Street S. with two, 30-story apartment towers:
- A “West Tower” at 223 23rd Street S. that would be 309 feet tall and have 613 dwelling units, 4,379 square feet of retail and 184 parking spaces
- An “East Tower” at 2250 Crystal Drive that would be 304 feet tall, and have 827 dwelling units, 13,059 square feet of retail and 249 total parking spaces
Most of the buildings on the block, dubbed “Block M” in the 2010 Crystal City Sector Plan, are owned by JBG Smith: the apartments 220 20th Street S. and Crystal Plaza 6 and the offices and retail at 2200 and 2100 Crystal Drive.
Once approved and constructed, the development would make the block 80% residential. On the same block, JBG Smith is replacing the Crystal Plaza 1 office building with two apartment towers, 2000 and 2001 S. Bell Street.

As part of the project, JBG Smith is responsible for providing two open spaces and building a new S. Clark-Bell Street to improve pedestrian, car and transit circulation near Route 1. But the developer has to work around Crystal Plaza 6, which it owns, and the Crystal Plaza Apartments, owned by Dweck Properties.
JBG Smith proposes putting the new S. Clark-Bell Street west of these buildings, which could create future transit connectivity challenges, county planner Michael Cullen said in a staff presentation last month.
“While much of the vision relies on the redevelopment of the Crystal Plaza Apartments and the Crystal Plaza 6 site at 2221 Clark Street S., the proposed site plan project will be establishing critical alignments for future entry and exit points that will impact the feasibility of achieving the ultimate roadway alignment,” he said.
An alley between the two towers that JBG Smith is proposing will be nothing but a dead end unless the Crystal Plaza Apartments are redeveloped, according to the county.
Until JBG Smith redevelops Crystal Plaza 6, the developer says it can only build an interim, 8,670-square foot park on the site’s southwest corner — not the 13,000-square foot park envisioned in the 2010 Crystal City Sector Plan.
That is likely more than a decade out. For now, Crystal Plaza 6 is home to furnished apartments that were previously one of the two U.S. locations of WeLive, WeWork’s experiment in communal living. Management changed hands after WeWork closed its Crystal City coworking space in January 2021.
The plan also envisions a 3,300-square foot plaza on the corner of 23rd Street S. and Crystal Drive. JBG Smith proposes moving the plaza and pedestrian access to a collection of underground shops and corridors to the northwest corner of the east tower.
From now through next Monday (March 14), people can weigh in on these sector plan departures.
Still, land use attorney Kedrick Whitmore writes that the project achieves the sector plan’s major goals.
“The proposed development will help to create the 18-hour active environment, provide substantial transportation upgrades, particularly along 23rd Street, and enhance the retail environment,” he said in a letter to the county.
This project is the latest in a decades-long effort to redevelop Crystal City’s aging and vacant office buildings with more apartments, which Arlington County has treated as an avenue for realizing other neighborhood improvements.
Before it merged with JBG Smith, Vornado proposed one office and one apartment building on the site. The new plan reflects a shift in away from speculative office projects given Arlington’s high office vacancy rate, in addition to national office leasing and work-from-home trends in the wake of the pandemic.
The public will have a second opportunity to weigh in on the plans this summer, with online feedback addressing land use, design, architecture, transportation and open space. Planning Commission and County Board hearings are slated for this fall.
Recent Stories

EDBS Dental Billing Solutions is pleased to announce that it has achieved compliance with the federally mandated standards of the Health Insurance Portability and Accountability Act (HIPAA) through the use of Compliancy Group’s proprietary HIPAA methodology, The Guard® compliance tracking software, and HIPAA Seal of Compliance®.
The HIPAA Seal of Compliance is issued to organizations that have implemented an effective HIPAA compliance program through the use of The Guard, Compliancy Group’s proprietary compliance tracking solution.
Clients and patients are becoming more aware of the requirements of HIPAA compliance and how the regulation protects their personal information. Forward-thinking providers like EDBS Dental Billing Solutions choose the HIPAA Seal of Compliance to differentiate their services.
“Since the nature of our business being exclusively remote, we take HIPAA compliance very seriously. With the help of Compliancy Group, we are able to take steps to fortify our systems to protect PHI information and familiarize each employee about HIPAA and how we can further safeguard PHI data.” said EDBS Dental Billing Solutions founder Goldie De Leon.

Are you feeling overwhelmed or struggling to cope with life’s challenges? You’re not alone. Mental health issues are more common than you might think, and seeking help is a sign of strength, not weakness.
Our counseling service provides a safe, supportive environment where you can explore your feelings, identify negative thought patterns, and learn coping skills to manage your symptoms. Lauren is trained in evidence-based practices and specializes in a range of mental health concerns, including anxiety, depression, trauma, and addiction.
We understand that seeking counseling can be intimidating, but we believe that everyone deserves to live a fulfilling, happy life. Our approach is non-judgmental and compassionate, and we work collaboratively with you to develop a personalized treatment plan that meets your unique needs and goals.
We offer a free 15-minute consultation to see if our service is a good fit for you. Reach out at https://peacefulmindsolutions.com or call (703) 994-0300 to set up a consultation.
WHS Spring Festival
Join us at the WHS Spring Festival on April 22, 2023, from 10am- 3pm at Wakefield High School(main parking lot). Come out to shop, play, and eat!
Shop local vendors, arts & crafts, new and used items, food vendors/trucks, and
District 27 Toastmasters 2023 Virtual Conference
District 27 Toastmasters invites you to its annual conference where you can hear phenomenal speakers, attend professional development and personal growth seminars about leadership, negotiation, communication, teamwork, and mentorship. Learn how to develop your personal story and how to improve