Schools

Sleet and frozen rain caused few problems in Arlington during the day, but untreated sidewalks and other surfaces turned icy at night as the sun set and temperatures dropped to be below freezing.

APS made the decision to open on a two hour delay earlier this morning. From APS:


News

Two local parks will receive extensive renovations under plans unanimously approved by the Arlington County Board at its meeting Saturday (December 16).

Benjamin Banneker (1680 N. Sycamore Street) and Fairlington (3308 S. Stafford Street) Parks will benefit. The former, near the East Falls Church Metro station, has expanded in recent years as the county has acquired more land.


News

The amphitheater at Fairlington Park is set to be replaced by a playground in the park’s final phase of renovations.

The final phase for the park at 3308 S. Stafford Street includes a playground for children in the 2-5 and 5-12 age groups, outdoor fitness equipment, a picnic area, improved ADA accessibility, furniture, landscaping, and improvements to drainage and stormwater management.


News

The Arlington County Board voted 4-1 at its Tuesday meeting to build the Long Bridge Aquatics & Fitness Center, the first of its kind in the county.

The Board approved a construction contract worth $60 million with Coakley & Williams Construction, Inc., which was one of four finalists to propose a design for the center.


News

Arlington County Manager Mark Schwartz is recommending a “simple and efficient” design for the Long Bridge Park Aquatics Center.

Schwartz recommended late last week that the county hire Coakley & Williams Construction, Inc. for the project, one of four contenders for the design and construction of the revamped center at 475 Long Bridge Drive.


News

Police and firefighters are on scene of a rollover crash on Wilson Blvd involving an Arlington County Park Ranger.

A car reportedly struck the back of the park ranger’s SUV, causing it to flip on its roof. Wilson Blvd is currently blocked at Patrick Henry, near Upton Hill Regional Park, while police investigate and the wreckage is cleared.


News

The four possible designs for the next phase of the Long Bridge Park Aquatics Center have been released.

The revamped center at 475 Long Bridge Drive will have a 50-meter pool; diving platforms from one, three and five meters up; a family pool; and health and fitness spaces. The contractor can then add extra features from a “menu” of potential options, so long as it stays within budget.


Around Town

The second phase of renovations at High View Park are complete, ahead of a ribbon-cutting ceremony Saturday (October 14).

The park at 1945 N. Dinwiddie Street in the Langston-Brown neighborhood received new restrooms and storage, a new picnic area, a new entrance from N. Dinwiddie Street, new paving, steps and bleachers for the basketball courts, a regraded field and new lights, trees and plantings.


News

Arlington Pitching Brainpower to Amazon — Arlington Economic Development Director Victor Hoskins plans to emphasize Arlington’s highly-educated workforce — 70 percent of the population has a bachelor’s degree or higher — in trying to woo Amazon’s new headquarters to the county. [Washington Business Journal]

Animal Control Called for Normal Raccoon — Someone called animal control to report a raccoon “acting strangely” on the 600 block of S. Carlin Springs Drive last week. An animal control officer responded and determined that “its behavior was normal.” [Twitter]


View More Stories