News

(Updated 6:00 p.m.) A new survey shows that a majority of Arlingtonians are satisfied with public transit, but their levels of satisfaction vary by geography.

Mobility Lab, a division of Arlington County Commuter Services, surveyed county residents last year to gauge travel patterns for work and non-work trips as well as concerns about public transit. This “state of the commute” survey was last conducted in 2010 and 2016, and the 2021 results included additional information about the pandemic’s effect on travel in Arlington.


News

A proposed bridge for bicyclists and pedestrians between Crystal City and the Southwest Waterfront area of D.C. has received $20 million in federal funding to move forward.

When complete, the 16-foot-wide shared-use path will connect Long Bridge Park and East and West Potomac parks via the Mount Vernon Trail.


News

An end date is in sight for construction work around the Ballston Metro station.

After two years of navigating the active work site and catching the bus from temporarily relocated stops, transit riders could have access to the updated transit facilities and adjacent public areas sometime next month.


News

(Updated at 4:30 p.m.) A handful of main roads in Arlington may be getting speed limit reductions.

At its meeting this Saturday, the Arlington County Board is slated to vote to advertise a potential reduction in the speed limit on four arterial streets, per a staff report.


News

The Wild West of e-bikes and e-scooter parking is being tamed.

Last month, Arlington County began installing 100 special street parking spaces for shared and private micro-mobility devices. And shared transportation providers such as Bird, LINK and new arrival Veo are footing the bill.


Around Town

Hundreds of additional e-bikes are arriving in Arlington.

The Chicago-based Veo is in the process of deploying 400 new e-bikes across the county. It’s the latest e-bike company to move into Arlington, joining Lime. Next month, Veo will also launch 300 e-bikes in Alexandria.


News

Members of the public can weigh in on proposed improvements to a stretch of S. George Mason Drive that’s being studied.

The road renovation project from Arlington Blvd to the Fairfax County border is part of the South George Mason Drive Multimodal Transportation Study, which aims to “identify improvements” along this “key corridor,” according to the project’s website.


News

A temporary roundabout along Military Road has garnered strong feelings as a deadline for community feedback nears.

The pilot project at Military Road and Nelly Custis Drive launched in October, with bollards in place to direct traffic around the center, and has reduced speeds on all approaches, according to data the county recently released. Benefits to pedestrians are less clear, as vehicle rates were varied and there were small sample sizes for pedestrian crossings.


News

(Updated on 6/2) Wider sidewalks may be coming to a major Potomac River crossing.

The long-awaited rehabbing of the Theodore Roosevelt Bridge, one of the main thoroughfares connecting Arlington to D.C., will result in a new paint job, updated overhead lights, and significant widening of sidewalks, a new D.C. Department of Transportation report says.


News

Members of Congress from Virginia are pushing the federal government to help fund proposed changes to Route 1.

The changes, while still being hashed out by VDOT and local officials, would lower elevated portions of Route 1 through Crystal City to grade, turning it into a lower-speed “urban boulevard.” VDOT is also mulling at least one pedestrian bridge or tunnel at 18th Street S., near the Metro station, to improve safety.


News

From a new Columbia Pike library to a dedicated pickleball court, County Manager Mark Schwartz’s proposed 10-year $3.9 billion capital improvement plan would fund projects across Arlington.

The first 10-year plan for capital projects in four years would budget for infrastructure projects between 2023 and 2032. The CIP proposal, slated for adoption in July, is a 40% increase from the plan approved four years ago, Schwartz said in his presentation to the County Board Tuesday.


View More Stories