(Updated at 2:40 p.m.) After months of public review, a proposal for two mixed-use towers in Crystal City from JBG Smith is slated for County Board approval this Saturday.
The 2.4-acre site is located at the intersection of Richmond Highway and 20th Street S., just north of the Crystal Plaza Apartments. As part of the project, initially filed in 2019, the Bethesda-based developer proposes demolishing an existing office building and surface parking lot, and shifting S. Clark Street to the east to create a new S. Clark-Bell Street.
It its place will be two towers with more than 750 residential units.
JBG Smith has made some changes in response to criticism from members of the Crystal City Civic Association, as well as a few transportation and pedestrian commission members.
In January, some criticized the width between the two buildings, separated by the new S. Clark-Bell Street, for being narrower than the width called for in the Crystal City Sector Plan. Residents also said a proposed — mostly cement — pedestrian plaza should include more “trees, gardens and benches,” and worried that a proposed underground garage would have interfered with a network of tunnels known as the “Underground.”
Some plans have changed since then.
The pedestrian plaza “took a great step in the right direction to become something much more green, much more biophilic,” said principal planner Adam Watson during a Planning Commission meeting earlier this month.
As for the “Underground,” JBG Smith is now proposing a “fully enclosed, fully undergrounded, climate-controlled connection” from 12th Street S. to 23rd Street S., Watson said. A previous iteration had the tunnel open up when it connected with the garage.
The final proposals for the above-ground plaza and underground tunnel “evolved over the course of the public community engagement process,” Watson said.
The space between the two buildings, separated by the new S. Clark-Bell Street, still falls a few feet short of the Crystal City Sector Plan but the county is giving this deviation a pass.
“Staff finds the proposed street segment will provide sufficient functionality to support all modes of transportation,” according to the county.
JBG Smith is proposing a space of 76.5 feet between the two buildings, compared to the sector plan’s recommendation of 80 feet. Although 3.5 feet narrower, the street will accommodate two travel lanes southbound, one travel lane northbound, and a buffered bicycle lane in each direction.
S. Clark Street would shift east and — south of the buildings — tie into the existing S. Clark Street, according to the county report.
“The northern end will align with S. Bell Street, north of 20th Street S. and create a new four-way signal-controlled intersection and remove the existing intersection with 20th Street S.,” the report said.
The density of the towers has also decreased slightly. While they are the same height, both have less ground-floor retail space and fewer residential units.
The West tower (2000 S. Bell Street) now has the following specifications:
- 367,040 sq. ft.
- 338 units
- 12,244 square feet of commercial or retail space
- 250 feet tall
The East tower (2001 S. Bell Street) now has the following specifications:
- 334,061 sq. ft.
- 420 units
- 10,006 square feet of commercial or retail space
- 200 feet tall
There will be 247 parking spaces for residents and 10 visitor spaces, along with 45 spaces for retail users. Additional parking will be available in existing garages.
“Parking for the new site plan would be provided in a new underground garage (302 spaces total), while parking for the remainder of the block, totaling 1,386 spaces, is accommodated in the existing underground parking structure to remain,” notes the county staff report.
The number of spots dedicated for the new development results in a parking ratio of 0.32 spaces per residential unit, which is just a hair above the minimum ratio (0.3) for the Metro-accessible Richmond Highway area, according to county parking guidelines.
Arlington Transportation Commission Chair Chris Slatt said the commission “fully supports the applicant’s parking ratio and is excited to see such a low parking ratio so close to Metro.”
As part of a community benefits package, JBG Smith will contribute $3.35 million to the county’s Affordable Housing Investment Fund and provide seven off-site committed affordable units within the nearby RiverHouse James Building.
Recent Stories

Synetic Theater Camps are a wildly fun, highly accessible choice for young people who love moving, playing games, and making memories. Registration is open now for Summer Camps (sessions June 20-August 25) and there are even a few spots left for Spring Break camp, April 3-7.
Located in National Landing, these performance-based camps are designed for students of all ages – no theater or performance experience required.
Led by professional teaching artists, campers learn acting, movement, and technical theater skills through the lens of Physical Theater. Physical Theater incorporates acting, movement, dance, mime, and acrobatics. If you’ve seen a Cirque du Soleil performance, you’ll find many similarities.
Most first-time campers are new to the performing arts, and teaching artists are well-versed in engaging students at all levels. Parents and campers report that one of the best parts of Synetic is the community, with many families returning year after year because they feel a strong sense of belonging.

EDBS Dental Billing Solutions is pleased to announce that it has achieved compliance with the federally mandated standards of the Health Insurance Portability and Accountability Act (HIPAA) through the use of Compliancy Group’s proprietary HIPAA methodology, The Guard® compliance tracking software, and HIPAA Seal of Compliance®.
The HIPAA Seal of Compliance is issued to organizations that have implemented an effective HIPAA compliance program through the use of The Guard, Compliancy Group’s proprietary compliance tracking solution.
Clients and patients are becoming more aware of the requirements of HIPAA compliance and how the regulation protects their personal information. Forward-thinking providers like EDBS Dental Billing Solutions choose the HIPAA Seal of Compliance to differentiate their services.
“Since the nature of our business being exclusively remote, we take HIPAA compliance very seriously. With the help of Compliancy Group, we are able to take steps to fortify our systems to protect PHI information and familiarize each employee about HIPAA and how we can further safeguard PHI data.” said EDBS Dental Billing Solutions founder Goldie De Leon.
WHS Spring Festival
Join us at the WHS Spring Festival on April 22, 2023, from 10am- 3pm at Wakefield High School(main parking lot). Come out to shop, play, and eat!
Shop local vendors, arts & crafts, new and used items, food vendors/trucks, and
District 27 Toastmasters 2023 Virtual Conference
District 27 Toastmasters invites you to its annual conference where you can hear phenomenal speakers, attend professional development and personal growth seminars about leadership, negotiation, communication, teamwork, and mentorship. Learn how to develop your personal story and how to improve