News

Arlington asking residents to weigh in on potential transportation upgrades in Courthouse

Arlington County is looking to make a three-block stretch in Courthouse safer for pedestrians, cyclists and motorists.

Specifically, it is looking for ways to improve conditions along a three-block stretch of Wilson Blvd and Clarendon Blvd between N. Uhle Street and N. Adams Street.

The county says the overall project goal is to “create a safe and consistent travel experience for people walking, taking transit, biking, and driving through the Courthouse section of the Rosslyn-Ballston corridor,” which has a lot of pedestrian, transit and micro-mobility activity.

Through this Sunday, the county is asking people to share their current experiences as road users and what upgrades matter to them.

When it comes to government priorities, safety is a top concern. The county says Clarendon and Wilson Blvd have seen a higher concentration of critical crashes in recent years.

They are included in a “High Injury Network,” a designation the county uses to prioritize adding transportation safety features to its least-safe roads. This is part of Arlington’s Vision Zero initiative to eliminate fatal and severe-injury crashes by 2030.

Within the project’s boundaries, there was a pedestrian crash with severe injuries on Clarendon Blvd in 2015, per a dashboard of crashes with severe and fatal injuries. One block east of the intersection with N. Uhle Street, there was a fatal pedestrian crash in 2014.

Another aim is to fill a “missing link” in bicycling facilities. Clarendon and Wilson Blvd are identified as “primary bicycling corridors” in the county’s Master Transportation Plan, as is N. Veitch Street, which connects cyclists to Langston Blvd, the Custis Trail and the Arlington Blvd Trail.

The county says it aims to realize community visions for better walking, cycling and transit experiences in Courthouse with new curbs and ramps for people with disabilities and improved bus stops and facilities near the Courthouse Metro station.

To encourage (proper) use of shared e-bikes and scooters, the county will review and provide “adequate end of trip facilities.” That could look like the corrals it has installed elsewhere in the Rosslyn-Ballston corridor and in Crystal City and Pentagon City.

Whatever improvements are selected would link to upcoming road resurfacing work. The county previously incorporated small upgrades when it resurfaced Clarendon Blvd from Courthouse Road and N. Scott Street and from N. Garfield Street to N. Adams Street.

The improvements would also link to street upgrades developer Greystar is delivering via its under-construction Landmark development (2050 Wilson Blvd), set to wrap up this fall, and its redevelopment on the former Wendy’s site (2025 Clarendon Blvd).

Those projects will bring about:

  • A “bike island” at the intersection of 15th Street N. and Clarendon Blvd, as well as more and wider protected and dedicated bike lanes
  • Wider sidewalks
  • Improving pedestrian crossings of Wilson Blvd and Clarendon Blvd
  • Two new “floating” bus stops
  • A pedestrian promenade along N. Uhle Street from Clarendon Blvd and 15th Street N.
  • Relocated and newly installed traffic signals