News

Arlington County has promised to build a sidewalk for every street, but when it comes to some residential neighborhoods progress is slow.

The main way sidewalks are built in residential areas is via the Neighborhood Conservation (NC) Program, which was created in 1964 and allows neighbors to weigh in on proposed sidewalk designs, among other small local projects that are proposed for county funding.


News

The Arlington County Board is considering lowering daycare parking space minimums for the second time this year.

During a Board meeting earlier this month, members scheduled public hearings in July on lowering the number of parking spaces child care centers must have. This comes after members modified parking minimums three months ago — from one space per employee down to one space per eight children.


News

Newly-revised plans for the redevelopment of the Key Bridge Marriott site in Rosslyn include a new bike path.

Los Angeles-based developers Woodridge Capital Partners and Oaktree Capital Management purchased the hotel at 1401 Lee Highway for $190 million last year. Since then, the developers proposed renovating the 582-room hotel and adding three residential buildings to the site — two with condominiums and one with apartments.


Schools

An Arlington teacher received a Citizens Award after saving third-grade student Grant, who was choking during lunch.

The Arlington County Fire Department and Arlington Public Schools recognized Jamestown Elementary teacher Jaimie Sapp last week after Grant’s father Roger had contacted the department to say how impressed he was by her quick actions.


News

(Updated at 2:45 p.m.) Whether or not Arlington County chooses to make a small code change could have a big impact on how quickly the county rolls out 5G wireless technology.

The new technology promises faster mobile data speeds and a network more capable of real-time connections to “smart city” infrastructure like driverless cars, among other benefits. But 5G requires many small devices with antennas be installed throughout an area to work — and that’s where plans hit a snag in Arlington.


Events

Next month, the county will hold a public meeting about Amazon’s first phase of new development for HQ2.

The meeting will “kick off the review process” for Amazon’s first construction project on S. Eads Street, according to a public event notice. The following week, the county’s planning commission will hold a formal review of the development plans.


News

The Rosslyn boathouse project is one step closer to setting sail, thrilling some local officials but also facing opposition from some local residents.

The National Park Service ushered the project along to a new phase this week, announcing that the proposed site for the boathouse in Rosslyn will have no significant environmental impact. This closes NPS’ environmental assessment of where the boathouse could be located that has dragged on for seven years, and means the design phase can begin.


News

Arlington is considering a new online system that would digitize the county’s permitting system.

The new system aims to move the Permit Office’s application process into a digital database while phasing out paper applications. Staff is expected to start testing the system — now dubbed “Permit Arlington,” after formerly being known as “One-Stop Arlington — next month.


News

Two apartment communities along the Columbia Pike corridor could soon be getting major facelifts.

Developers are planning to build a new three-to-four story affordable residential building to replace Arlington View Terrace, a 77-unit apartment complex at the 1400 block of S. Rolfe Street, according to a presentation last week to the county’s Form Based Code Advisory Working Group.


View More Stories