Plans are underway to address Arlington Memorial Bridge’s crumbling facade and deep structural issues, but over the next week it will mean extra traffic for morning commuters across the bridge.

From today (Monday) until Friday (Aug. 17) two lanes of Arlington Memorial Bridge on the G.W. Parkway will be closed to prepare the bridge for full rehabilitation later this fall. The rightmost westbound lane will be closed from 6 a.m. until 3 p.m. and the center eastbound lane will be closed from 9:30 a.m. until 3 p.m.


A new water main is almost finished being installed along a portion of Columbia Pike as construction continues on the roadway, according to a July 31 construction update from the county.

The water main work represents part of construction that runs along Columbia Pike from Arlington’s border with Fairfax County through Four Mile Run Drive. Expected to last about three years from its kickoff in February, the project includes moving overhead utilities underground, changing out older water and sewage pipes and making street improvements.


Signature Theatre’s annual open house will take place in the Village at Shirlington between noon and 8:30 p.m. Sunday (Aug. 5), accompanied by a road closure.

The Arlington County Police Department will close Campbell Avenue from S. Arlington Mill Drive to S. Randolph Street from around 8 a.m. to 11 p.m. for the event.


The National Park Service is warning drivers about severe traffic backups on the GW Parkway starting today (Monday) and running through the fall, as rehab work on the Windy Run Bridge gets going.

Workers have spent the last few weeks removing guard rails and center curbs, as well as doing some paving work, in order to prepare for work on the bridge, located in northeast Arlington near the Woodmont and Riverwood neighborhoods.


An overhaul of the “Five Points Intersection” in Cherrydale should be completed soon, with night work to finish pavement markings and paving scheduled from 10 p.m. to 5 a.m. starting Monday (July 30) and continuing through Thursday (Aug. 2), weather permitting.

Work got underway last September, and changes included upgrading all traffic signal equipment, adding or modifying several lanes and improving crosswalks.


Expect some major traffic backups on I-395 starting this weekend, due to construction work set to run from Springfield through the D.C. line.

Starting tonight, two general purpose lanes will close on the highway from Friday nights through Monday mornings every weekend through Aug. 26.


Watch out for some delays along the S. Washington Blvd bridge near the Pentagon tonight (Thursday).

The Virginia Department of Transportation says workers will be shifting the two westbound lanes to left, closer to the middle of the road, from about 10 p.m. to 5 a.m. They’re advising drivers to avoid the area, near the Pentagon’s north parking lots, or prepare to encounter some backups.


Construction around one of the Pentagon’s parking lots kicking off this week could produce some big headaches for drivers and bus riders alike.

Starting this morning (Monday), work will shut down the west side of S. Eads Street from Army Navy Drive to where it nears the Pentagon’s south parking lot at S. Rotary Road.


A light pole toppled over on a busy road near Clarendon this afternoon (Thursday), prompting lane closures and traffic delays.

The pole fell to the ground around 5:45 p.m. on Washington Blvd at the intersection with 10th Street N. At least one vehicle was damaged — a sedan with visible damage to its front that was driven up onto the median. Two other vehicles were stopped nearby with no obvious visible damage. All three were being driven when the streetlight fell.


View More Stories