Events

A “block party” style event with a transportation theme is set for later this month along Columbia Pike.

Arlington County is hosting its third annualOur Shared Street Pop-Up” on Thursday, August 22, in the parking lot at the intersection of S. Four Mile Run Drive and the Pike. The event will run from 5-7 p.m. that night, and will feature booths from transportation organizations with activities and answers to transportation questions.


Around Town

Rosslyn’s Dark Star Park is growing and recently swallowed a nearby slip lane.

The park is notable for the somewhat strange concrete orbs and poles, designed to cast perfectly aligned shadows every August 1. The expansion of the park was planned as part of the Core of Rosslyn study, a project aimed at making Rosslyn’s street network more pedestrian- and cyclist-friendly.


News

Proposed changes could help transform a major street in the Pentagon City and Crystal City area into a more pedestrian and bicycle friendly corridor, though it might make traffic a little more congested.

The Army Navy Drive Complete Street project would provide a physically-separated, two-way protected bicycle lane along the south side of Army Navy Drive from S. Joyce Street to 12th Street S. Changes would also make pedestrian crossings shorter and safer, with options to build dedicated transit lanes in the future.


News

Helicopter Complaints Continue  — “Rep. Don Beyer (D-Va.), one of the lawmakers who requested the study, said that helicopter noise is ‘our number one constituent complaint’ and that the number of complaints has risen steadily since he took office in 2015.” [Washington Post]

Early Morning Apartment Fire — “Units were called to 2400 blk 27th Ct S for fire in 4 story garden apt. On arrival crews found balcony #fire on floors 1 & 2 being controlled by #firesprinklers. Fire extinguished, no extension inside. No injuries.” [Twitter]


News

Arlington County Board members are scheduled to consider paving a connection between the W&OD Trail and 9th Street S. in Barcroft by the Buchanan Community Garden.

The proposal is to put an asphalt connection and a stop sign between 9th Street and the trail, crossing an area on the side of the trail currently used by Dominion subsidiary Virginia Electric Power Company.


News

Fire Outside Shirlington Apartment BuildingUpdated at 9:30 a.m. — “ACFD working to extinguish a dumpster fire near an apartment building at 3000 S. Randolph Street in Shirlington. ‘Smoke conditions’ reported in portions of the building.” [Twitter, Twitter]

The Cost of Renaming Washington-Lee — “It will cost taxpayers about a quarter of a million dollars to change ‘Lee’ to ‘Liberty’ on the name of Arlington’s oldest public high school. School officials have released an estimate of $224,360 for the name change, with about two-thirds of the total for ‘soft costs’ (uniforms, athletic equipment and the like) and the remainder ‘hard costs’ such as signage.” [InsideNova]


News

Officials are hoping to find ways to close the only break in the 45-mile long Washington & Old Dominion (W&OD) Trail.

The Metropolitan Washington Council of Governments’ Transportation Planning Board (TPB) approved $680,000 in assistance for 13 projects, including one to look into options to close a gap near the East Falls Church Metro station.


News

The county is moving forward with long-held plans to narrow lanes and widen sidewalks on Columbia Pike near the Penrose neighborhood, but not everyone is on board.

County staff presented an updated version of the plan last week to the Penrose Neighborhood Association. It calls for narrowing the lefthand travel lanes on the Pike east of S. Wayne Street down to 10 feet, and narrowing the righthand lanes, next to the sidewalk, to 11 feet.


News

Plans are coming together for a major transformation of Rosslyn’s streets, as county officials advance a series of proposals designed to someday make the neighborhood a bit more friendly to cyclists and pedestrians.

The county is holding a public meeting tomorrow (Wednesday) to unveil a newly revised design for the future of Rosslyn’s street network. Known as the “Core of Rosslyn” study, planners have been working since 2017 to finalize a redesign of the neighborhood that comports with the “Rosslyn Sector Plan” the County Board adopted in 2015.


News

Construction work on the Ballston Quarter pedestrian bridge will prompt yet more road closures tonight (Friday), but the more extensive work set for weeknights is on hold for a bit.

For the second straight week, workers plan to close Wilson Blvd between N. Randolph and N. Stuart streets starting at 8 p.m tonight through Sunday at 6 p.m.


News

Rosslyn is set to see a few more pedestrian safety improvement over the course of the next year or so.

The neighborhood’s Business Improvement District, which advocates for Rosslyn businesses by collecting a small property tax, is planning a variety of short-term fixes to make the bustling streets a bit safer for walkers.


View More Stories