The Board will consider a $573,000 contract to build a new “sprayground” at Virginia Highlands Park, at 1600 S. Hayes Street near Pentagon City. The park was originally scheduled to open this past Memorial Day, but the project has been beset by delays. According to the staff report, the project was finally put out for bid in May, only to have the bids from contractors all came in higher than expected.
The sprayground was redesigned in order to put it within budget. A new water re-circulation system, which should save 113,000 gallons of water per week, was put into place. The sprayground was also reduced in scale, and certain features like a steel fence and a designed rock structure were eliminated.