Police shut down Quincy Street from Washington Boulevard to Fairfax Drive while conducting their investigation. Although it’s currently unclear if icy roads contributed to the accident, a salt and sand truck was called to the scene due to police reports of ice.

Drivers are reminded to use extra caution because this week’s quick temperature drop has caused ice to form on certain streets that may not traditionally be known for icy conditions.


The traffic light sat the busy Clarendon intersection of Washington Boulevard, 10th Street and Fillmore Street is expected to remain dark throughout the morning rush hour following a car accident Thursday night.

Around 7:15 last night a car hopped the curb and took out the traffic signal control box near the Virginia ABC store. One minor injury was reported.


VDOT crews are on their way to the scene to clean up the loose gravel, but Arlington County officials say they don’t know long the clean-up will take.

Just before 9:30 a.m. a car slammed into the guardrail on westbound I-66 beneath the Patrick Henry Drive underpass, near the gravel spill. It’s not clear if the gravel caused or is somehow related to the accident.


Sergeant Michael Boehm, a 19-year Park Police veteran, suffered an apparent heart attack and collapsed while responding to man found critically injured under the Key Bridge in D.C. on Dec. 16. Boehm, an Army veteran, was rushed to a local hospital but was later pronounced dead. He is survived by a wife and a son.

According to USPP, Boehm’s funeral procession will depart from a Burke, Va. funeral home at approximately 11:30 a.m. on Dec. 28. It will head into the District, pass by Park Police headquarters near Hains Point, then head back to a cemetery in Fairfax.


A new set of traffic lights and pedestrian crossing signals are being installed at the intersection of Wilson Boulevard and N. Wakefield Street.

The traffic signals are located next to the Murphy Funeral Home and a new residential development, in the Bluemont neighborhood near Ballston. A developer agreed to pay for the traffic signals in 2008 as part of the development’s site plan process. At the time, county staff argued that increased traffic from the development would necessitate the installation of traffic signals.


With deep potholes, large pools of standing water, and no lane markings, the road — which connects Boundary Channel Drive and Crystal Drive/12th Street S. — is not easily traversed by anything smaller than an SUV.

That was less of a problem when the road served primarily as a short cut for adventurous I-395 commuters and Pentagon employees. Since November, however, Old Jefferson Davis Highway has been the sole road leading to the newly-opened, $31 million Long Bridge Park. That has led to some grumbles among park users.


In order to make your holiday traveling easier, the Virginia Department of Transportation is suspending most lane closures during the Christmas and New Year’s holidays. Here’s what VDOT said in a release:

RICHMOND — The Virginia Department of Transportation (VDOT) is clearing a path for travelers this holiday season by lifting lane closures over the extended Christmas and New Year’s weekends.


The northbound (inbound) lanes of the Key Bridge are closed due to a “police situation.”

Initial reports suggest a person may have jumped off the bridge, possibly on the D.C. side. Traffic cameras show Arlington police redirecting traffic heading toward the bridge on N. Lynn Street onto northbound Lee Highway and the George Washington Parkway.


New traffic signals were being installed today at the busy intersection of Wilson Boulevard and N. Pollard Street in Ballston, near the Gold’s Gym and the Wiinky’s burger restaurant.

The installation comes about three months after the Sun Gazette reported, in an article entitled “Residents Find Developer Payments Don’t Translate Into Traffic-Signal Installation,” that a developer had agreed to contribute $150,000 toward the addition of traffic signals at the intersection back in 2004. At the time of the article, the County Manager Barbara Donnellan promised to investigate why the traffic signal had not yet been installed.


The first phase of the project will add a southbound lane to the portion of Crystal Drive between 12th Street and 15th Street, just north of the Crystal City water park. It will also convert a one-way section of S. Clark Street between 12th and 15th Streets to a two-way road. Construction on this phase of the project is expected to begin in the spring of 2012 and wrap up in winter 2012.

A second phase is expected to begin construction in fall 2012. That phase will add a southbound lane to the one-way portion of Crystal Drive between 23rd Street and 27th Street. Changes will also be make to 27th Street, which runs between the Courtyard by Marriott and the Hyatt Regency hotels.


View More Stories