News

Transportation officials are proposing a host of safety improvements for Memorial Circle, a confusing confluence of roads connecting Arlington National Cemetery to the Arlington Memorial Bridge.

The circle has long been the site of all manner of dangerous crashes, particularly those involving cyclists and pedestrians looking to access the nearby Mt. Vernon Trail or cross into D.C. But the National Park Service has drawn up a series of changes for the roads in the area designed to address the issue, including traffic pattern changes to transform the circle into something more like a traditional roundabout.


News

County Manager Warns of Tough Upcoming Budget — “Arlington County faces an estimated budget gap of $20-35 million for its 2020 fiscal year, which could require cuts to County services, increased taxes and fees, or a combination of the two. County Manager Mark Schwartz… said that County revenues are forecast to grow by a modest 1.5 percent, while expenditures for the County’s current set of programs are anticipated to grow twice as fast.” [Arlington County, Washington Post]

GW Parkway Rebuild Coming — “Much of the George Washington Parkway will see a complete rebuild in the next few years — and though it’ll surely result in smoother pavement and longer acceleration lanes, good things on the road only come after lengthy closures. An $150 million overhaul of the George Washington Parkway, including a rework of the interchange with Virginia Route 123, is moving forward.” [WTOP]


Traffic

A crash on southbound I-395 near Arlington Ridge Road temporarily closed the highway.

The crash happened in the usual rainy weather spot — as traffic rounds a curve en route to the Glebe Road and Shirlington exits. All southbound lanes were closed for a period of time, but three lanes have since reopened, with the crash moved over to the right-hand side.


Traffic

Prep work for major construction on the Memorial Bridge is prompting some lane closures and other travel disruptions in the area over the next few days.

Workers are planning to set up “staging areas” just south of Memorial Circle to prepare for a full rehab effort on the bridge later this fall, which will include a full weekend shutdown of the bridge in mid-September.


News

Heat Advisory in Effect — Arlington and D.C. are under a Heat Advisory from noon to 8 p.m. today. The heat index this afternoon is expected to reach between 100 and 105 degrees. [National Weather Service, Twitter]

Hacked Sign Causes County Concern — ARLnow’s report about an electronic road sign near Shirlington being hacked to display a vulgar video game meme prompted a serious conversation at county government headquarters. “To some this is a ‘prank’ to me it is an indication of a lack of security on a portion of our [technology] infrastructure,” Arlington’s Chief Information Officer wrote in an internal email chain. “What if the message was ‘Terrorist Attack in Washington, please leave the area'[?]” [State Scoop]


Traffic

Plans are underway to address Arlington Memorial Bridge’s crumbling facade and deep structural issues, but over the next week it will mean extra traffic for morning commuters across the bridge.

From today (Monday) until Friday (Aug. 17) two lanes of Arlington Memorial Bridge on the G.W. Parkway will be closed to prepare the bridge for full rehabilitation later this fall. The rightmost westbound lane will be closed from 6 a.m. until 3 p.m. and the center eastbound lane will be closed from 9:30 a.m. until 3 p.m.


News

There may be yet more rain in the forecast, fresh on the heels of last month’s persistent storms, but don’t expect to see the sort of flooding that trapped dozens of people in their cars on the GW Parkway two weeks back.

That’s the word from National Park Service officials, who believe the waves of water covering the parkway back on July 17 were more a fluke than anything else.


News

Amazon Hiring Local ‘Economic Development Manager’ — Amazon is hiring for a new position of economic development manager in the D.C. area, though the company says the position is not connected to its HQ2 search. Per the Business Journal: “Responsibilities would include working on site selection, ‘new corporate initiatives, site expansion plans and requirements,’ and working with ‘state and community economic development, workforce and labor, taxation, and other key government agency officials, as well as chambers of commerce, utilities, and other key public/private stakeholder groups.'” [Washington Business Journal, Amazon]

New Food Hall Coming to Rosslyn — The team behind Chasin’ Tails seafood restaurant in East Falls Church is planning a new 5,000-square-foot Asian food hall, dubbed “Happy Endings Eatery,” at Rosslyn’s Central Place complex. Among the expected offerings will be Vietnamese food like summer rolls, noodle bowls and banh mi sandwiches; bubble teas; and Vietnamese coffee. [Washington Business Journal]


Traffic

The National Park Service is warning drivers about severe traffic backups on the GW Parkway starting today (Monday) and running through the fall, as rehab work on the Windy Run Bridge gets going.

Workers have spent the last few weeks removing guard rails and center curbs, as well as doing some paving work, in order to prepare for work on the bridge, located in northeast Arlington near the Woodmont and Riverwood neighborhoods.


Traffic

Some major renovations are on the way for the GW Parkway as it runs from Rosslyn to I-495, and transportation planners want to hear from you about how the highway can improve.

The National Park Service, which maintains the road, is accepting public comments on the project from now through July 14. The effort is a long way from kicking off — the NPS has yet to even find funding for the construction — but officials are dubbing it a “major rehabilitation” of that section of the highway as it nears “the end of its design lifespan.”


News

Action Coming on Child Care Initiative — “When it comes to addressing issues related to child care, “this is a year we’re looking to see some concrete action,” [Arlington County Board Chair Katie] Cristol said during a May 30 meeting of the Kiwanis Club of Arlington.” [InsideNova]

Arlington Ridge Closures Continue — Daytime work will continue today on a collapsed 18-inch stormwater pipe, necessitating the daily closure of Arlington Ridge Road between Glebe Road and 23rd Street S. Rain and a leaking water main break slowed crews down last week. [Twitter]


News

Apple Eying Arlington, N. Va. — It’s not just Amazon — Apple is also looking to establish a large new office, potentially in Northern Virginia. Crystal City and the Rosslyn-Ballston corridor are among the sites the world’s most valuable company is considering for a new campus that would bring 20,000 jobs to the area. [Washington Post, Washington Business Journal]

Flood Watch Today — A Flood Watch is in effect today, starting this afternoon and running through Friday night. Heavy rain — 3 to 5 inches — is expected through Friday evening. [Capital Weather Gang, Twitter]


View More Stories